Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/70492
Export to Endnote
Title: Combined final report for EL 22631 'Beaver Dam 1' and EL 22632 'Beaver Dam 2', for the period ended 16 December 2004
Title Holder / Company: Terra Search
BHP Billiton Minerals
Report id: CR2004-0781
Tenure: EL22631;  EL22632
Year: 2004
Author: Cameron-Smith, K
Merrillees, J
Abstract: This Combined Final Report describes all work carried out by BHP Billiton Minerals Pty Ltd (BHPB) on Exploration Licences 22631 and 22632, Beaver Dam Project, Northern Territory. Exploration work was aimed at discovering Ni-Cu magmatic sulphide mineralisation of Voiseys Bay, Norilsk affinities, associated with Proterozoic stratigraphy under thin Cainozoic cover. The following exploration work was completed by BHPB on the Beaver Dam Project during the annual period ended 16 December 2004: full assessment and re-processing of previous airborne geophysical data; identification of a magnetic/EM target - MH2; drill testing of target MH2 with one hole for a total 202 m; rehabilitation of drill site. Drilling of target did not intersect Ni-Cu magmatic sulphide mineralisation below the Cainozoic cover as interpreted. Instead, the magnetic high was explained by a coarse magnetic garnetiferous biotite granodiorite with some local intense magnetite and magnetite-silica alteration zones. The EM response was caused by conductive Tertiary clays. No further targets were identified upon review of the project and BHPB surrendered ELs 22631 and 22632, effective 16 December 2005.
Date Added: 23-Oct-2013
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
CR20040781_2004_GAS_01.pdf1.35 MBPDF Add
CR20040781_2004_GAS_02_Pontifex_Petrology.doc172 kBMicrosoft Word Add
CR2004-0781_Appendices.zip323.96 kBZIP Add
CR2004-0781_Figures.zip981.19 kBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader