Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/67921
Export to Endnote
Title: | Annual report for EL 4441 Woolwonga for 26-11-1983 to 25-11-1984 |
Title Holder / Company: | Anaconda Australia |
Report id: | CR1985-0062 |
Tenure: | EL4441 |
Year: | 1985 |
Author: | Kavanagh, ME |
Abstract: | During 1984, the exploration program focused on the abandoned Woolwonga gold workings immediately south (500 metres) of the EL. The Woolwonga workings are covered by a group of 9 claims and leases held by Australian Coal and Gold. These leases were optioned by the Golden Dyke Joint Venture in August 1984. An exploration program comprising: gridding; costeaning and channel sampling; detail and reconnaissance mapping, and diamond drilling was undertaken on the optioned AC&G ground and immediately surrounding ground on EL 4177 and north into EL 4441. It was necessary to complete evaluation of the Woolwonga workings in order to determine the controls on mineralisation and hence plan evaluation of the strike continuation of the Woolwonga anticline northwards into EL 4441. |
Date Added: | 23-Oct-2013 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
CR19850062.pdf | 275.3 kB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.