Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/63427
Export to Endnote
Title: Bowgan Project EL 8997, 8998 and 9163 Final Report for the period ending 14 March 1997
Title Holder / Company: BHP Minerals
Report id: CR1997-0325
Tenure: EL8997;  EL8998;  EL9163
Year: 1997
Author: Stephens, D
Abstract: A 25Hz Geotem survey was flown in May 1996. A total of 1862 km of data was flown at a 1000m line spacing. 8 conductors were identified, though none were Priority 1 targets. Moving loop Protem surveys were completed over three of these anomalies. While a PROTEM sounding was completed over a fourth anomaly.
Date Added: 23-Oct-2013
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
CR19970325.pdf1.65 MBPDF Add
CR1997-0325_Geophysics.zip22.38 MBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader