Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/63199
Export to Endnote
Title: | Annual report to 25 February 1994 for Lancewood Project Tenements |
Title Holder / Company: | BHP Minerals |
Report id: | CR1994-0231 |
Tenure: | EL7201; EL7202; EL7816; EL7854; EL7855 |
Year: | 1994 |
Author: | Darby, PR Jones, BM Brown, IR |
Abstract: | The work completed within the group of licences included some 175 Protem soundings, ground magnetics, 5 diamond drillholes totalling 1888.5 m, 1869. 5m RC drilling, geological mapping, loam-stream sediment sampling. No manganese mineralization was identified within EL 7854 and the results of diamond exploration program are outstanding. 30 PROTEM soundings returned soundings warranting follow up. 2 of the stratigraphic holes in EL7201 returned anomalous values including 6m at 0.15%Zn. |
Date Added: | 23-Oct-2013 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
CR19940231.pdf | 15.35 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.