Please use this identifier to cite or link to this item:
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/79349
Title: | Keep River No.1 OP.162 Northern Territory Well Completion Report |
Title Holder / Company: | Australian Aquitaine |
Report ID: | PR1969-0009 |
Tenure: | OP162 |
Year: | 1969 |
Corporate Author: | Australian Aquitaine |
Drillhole/Well Name: | Keep River 1 |
Spud date: | 03/09/1968 |
Rig release date: | 22/03/1969 |
Bottom hole formation: | Quartzitic Sequence |
Geological Province: | Bonaparte Basin |
Map250: | Auvergne SD5215 |
Map100: | Legune 4767 |
Subjects: | Composite logs Drill core Engineering - Drilling Engineering - Testing Geological interpretation Downhole surveys Interpreted log data Laboratory tests |
Document Type: | Well Completion Report |
Appears in Collections: | Petroleum Wells (PEX Wells) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
Appendix1_FormationTesting.pdf | 1.82 MB | Add | |
Appendix2_CoreAnalysisReports.pdf | 1.4 MB | Add | |
Appendix3_LaboratoryResultsofKeepRiverNo1.pdf | 1.12 MB | Add | |
Appendix3_Plates.PDF | 6.72 MB | Add | |
Appendix4_WaterSaturationfromSchlumbergerLogsEvaluation.pdf | 78.05 kB | Add | |
Appendix5_VelocitySurveySonicCalibration.pdf | 3.7 MB | Add | |
Plates_CompostiteWellLogsXtoXVI.pdf | 5.03 MB | Add | |
PR19690009_WCR.pdf | 1.69 MB | Add | |
ReadMe.txt | 317 B | Text | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.