Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/79219Export to Endnote
| Title: | MacIntyre 2 Well Logs |
| Title Holder / Company: | PetroFrontier |
| Report id: | PR2011-0154 |
| Tenure: | EP127 |
| Year: | 2011 |
| Corporate Author: | Pathfinder Energy |
| Drillhole/Well Name: | MacIntyre 2 |
| Rig release date: | 20/11/2011 |
| NOTE: | MacIntyre 2 was drilled and suspended in 2011. It was re-entered in 2012 as a vertical hole before MacIntyre 2H was drilled horizontally. |
| Document Type: | Well Logs |
| Date Added: | 9-Jan-2015 |
| Appears in Collections: | Petroleum Wells (PEX Wells) |
Files in this Report:
| File | Size | Format | Add to Download |
|---|---|---|---|
| PR20110154_image_mem_SONIC_pc.las | 532.97 kB | Unknown | Add |
| PR20110154_Petrofrontier_MacIntyre-2_LWD.las.las | 410.06 kB | Unknown | Add |
| PR20110154_RHOB_IMAGE_pc.las | 914.42 kB | Unknown | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.