H0002 Version 4.0 H0003 Date_generated 21-03-2018 H0004 Reporting_period_end_date 01-02-2018 H0005 State NT H0100 Tenement_no ML23839 H0101 Tenement_holder Ark Mines Ltd H0102 Project_name Mount Porter H0106 Tenement_operator Ark Mines Ltd H0150 250K_map_sheet_number SD52-8 H0151 100K_map_sheet_number 5270 H0200 Start_date_of_data_acquisition 02-02-2017 H0201 End_date_of_data_acquisition 01-02-2018 H0202 Template_format SL1 H0203 Number_of_data_records 4 H0204 Date_of_metadata_update 21-03-2018 H0300 Location_data_file ML23839_2018_A_01_DrillCollars.txt H0301 Location_data_file ML23839_2018_A_01_DrillCollars.txt H0302 Downhole_lithology_data_file ML23839_2018_A_01_LithoLogs.txt H0303 Downhole_geochem_data_file ML23839_2018_A_01_DownholeGeochem.txt H0304 Downhole_survey_data_file ML23839_2018_A_01_DownholeSurveys.txt H0400 Drill_Code RC H0401 Drill_contractor WJ Drilling Pty Ltd H0402 Description RC Reverse Circulation H0500 Feature_located Hole_collar H0501 Geodetic_datum GDA94 H0502 Vertical_datum AHD Arbitrary RL500 Nominal H0503 Projection UTM H0530 Coordinate_system Projected H0531 Projection_zone 52 H0532 Surveying_instrument Real Time Kinetic Differential GPS H0533 Surveying_company Land Survey Pty Ltd H1000 Hole_ID Easting_MGA Northing_MGA Elevation_AHD Total_Hole_Depth Drill_Code Drill_Date H1001 metres metres metres metres H1004 0.020 0.020 0.040 0.1 D MPRC347 805481.970 8490922.930 224.010 44 RC 8/04/2017 D MPRC348 805465.577 8490994.628 218.923 55 RC 9/04/2017 D MPRC349 805432.724 8491001.354 227.638 50 RC 10/04/2017 D MPRC350 805437.482 8490952.664 223.563 53 RC 8/04/2017 EOF