H0002 Version 1 H0003 Date_generated 8-Apr-15 H0004 Reporting_period_end_date 27-Mar-15 H0005 State NT H0100 Tenement_no or Combined_rept_no ML29822 H0101 Tenement_holder ABM H0102 Project_name Twin Bonanza H0106 Tenement_operator ABM Resources NL H0150 250K_map_sheet_number SF5203 H0151 100K_map_sheet_number 4757 H0203 Number_of_data_records 51 H0301 Location_data_file ML29822_2015_A_11_TrenchCollars.txt H0302 Downhole_lithology_data_file ML29822_2015_A_12_TrenchLithology.txt H0303 Downhole_Assay_data_file ML29822_2015_A_13_TrenchAssay.txt H0304 Downhole_Survey_data_file ML29822_2015_A_14_TrenchSurv.txt H0305 Downhole_Samples_Data_File ML29822_2015_A_15_TrenchSamp.txt H0321 Downhole_Metadata_Data_File ML29822_2015_A_25_TrenchMetadata.txt H0400 Drill_code COST H0401 Drill_contractor N/A H0402 Drill code description Costean H0500 Feature_type Costean Collar Location H0501 Geodetic_datum GDA94 H0502 Vertical_datum AHD H0503 Projection MGA H0508 Local_grid_name N/A H0530 Coordinate_system Projected H0531 Projection_zone 52 H0532 Surveying_instrument DGPS H0533 Surveying_company ABM H0900 Comments N/A H1000 DataSet Hole_ID Hole_Type Max_Depth NAT_Grid_ID NAT_East NAT_North NAT_RL Nat_Survey_Method Nat_Survey_Date Nat_Survey_By Precollar_Depth BOCO_Depth TOFR_Depth Lease_ID Date_Started Date_Completed Responsible_Person Comments D Twin Bonanza OPTR0099 COST 120.783 MGA94_52 516061.091 7769110.898 438.459 DGPS 16/05/2014 KE ML29822 16/05/2014 16/05/2014 KE D Twin Bonanza OPTR0100 COST 181.168 MGA94_52 516190.933 7768944.514 440.72 DGPS 16/05/2014 KE ML29822 16/05/2014 16/05/2014 KE D Twin Bonanza OPTR0100A COST 81.562 MGA94_52 516391.912 7768945.155 442.549 DGPS 17/05/2014 PS ML29822 17/05/2014 17/05/2014 PS D Twin Bonanza OPTR0101 COST 175.298 MGA94_52 516211.741 7768874.94 442.079 DGPS 10/05/2014 PA ML29822 10/05/2014 10/05/2014 PA D Twin Bonanza OPTR0101A COST 63.119 MGA94_52 516412.667 7768875.962 443.282 DGPS 17/05/2014 PS ML29822 17/05/2014 17/05/2014 PS D Twin Bonanza OPTR0102 COST 184.917 MGA94_52 516229.862 7768811.931 442.322 DGPS 7/05/2014 JI ML29822 7/05/2014 7/05/2014 JI D Twin Bonanza OPTR0103 COST 25.525 MGA94_52 516392 7768418 447 DGPS 6/05/2014 JI ML29822 6/05/2014 6/05/2014 JI D Twin Bonanza OPTR0103A COST 7.074 MGA94_52 516428.211 7768418.684 446.551 DGPS 6/05/2014 JI ML29822 6/05/2014 6/05/2014 JI D Twin Bonanza OPTR0104 COST 60.981 MGA94_52 516533.126 7768133.005 449.252 DGPS 27/04/2014 AR ML29822 29/04/2014 29/04/2014 AR D Twin Bonanza OPTR0105 COST 47.45 MGA94_52 516539.289 7768108.236 449.348 DGPS 27/04/2014 AR ML29822 29/04/2014 29/04/2014 AR D Twin Bonanza OPTR0105a COST 44.3 MGA94_52 516590.737 7768109.752 449.697 DGPS 27/04/2014 AR ML29822 29/04/2014 29/04/2014 AR D Twin Bonanza OPTR0106 COST 29.634 MGA94_52 516398.73 7768078.901 447.988 DGPS 27/04/2014 AR ML29822 29/04/2014 29/04/2014 AR D Twin Bonanza OPTR0107 COST 94.111 MGA94_52 516552.625 7768077.348 449.712 DGPS 27/04/2014 AR ML29822 30/04/2014 30/04/2014 AR D Twin Bonanza OPTR0108 COST 58.235 MGA94_52 516658.132 7767981.628 450.671 DGPS 27/04/2014 AR ML29822 30/04/2014 30/04/2014 AR D Twin Bonanza OPTR0109 COST 51.743 MGA94_52 516567.389 7767935.063 449.579 DGPS 27/04/2014 AR ML29822 28/04/2014 28/04/2014 AR D Twin Bonanza OPTR0110 COST 50.385 MGA94_52 516584.018 7767873.931 449.801 DGPS 27/04/2014 AR ML29822 27/04/2014 27/04/2014 AR D Twin Bonanza OPTR0111 COST 32.974 MGA94_52 516648.831 7767873.89 450.902 DGPS 27/04/2014 AR ML29822 28/04/2014 28/04/2014 AR D Twin Bonanza OPTR0112 COST 31.892 MGA94_52 516699.131 7767764.674 451.583 DGPS 27/04/2014 AR ML29822 28/04/2014 28/04/2014 AR D Twin Bonanza OPTR0113 COST 151.099 MGA94_52 516622.27 7767668.787 450.643 DGPS 24/05/2014 KE ML29822 24/05/2014 24/05/2014 KE D Twin Bonanza OPTR0113A COST 16.724 MGA94_52 516796.482 7767667.201 452.394 DGPS 24/05/2014 KE ML29822 24/05/2014 24/05/2014 KE D Twin Bonanza OPTR0114 COST 78.089 MGA94_52 516741.783 7767564.423 452.439 DGPS 3/05/2014 AR ML29822 3/05/2014 3/05/2014 AR D Twin Bonanza OPTR0115 COST 50.643 MGA94_52 516770.223 7767544.676 453.171 DGPS 3/05/2014 AR ML29822 3/05/2014 3/05/2014 AR D Twin Bonanza OPTR0116 COST 52.869 MGA94_52 516780.221 7767520.411 453.191 DGPS 3/05/2014 AR ML29822 3/05/2014 3/05/2014 AR D Twin Bonanza OPTR0117 COST 145.175 MGA94_52 516518.518 7767477.15 450.593 DGPS 4/05/2014 AR ML29822 4/05/2014 4/05/2014 AR D Twin Bonanza OPTR0117A COST 174.928 MGA94_52 516683.859 7767479.452 452.142 DGPS 4/05/2014 AR ML29822 4/05/2014 4/05/2014 PA D Twin Bonanza OPTR0118 COST 174.928 MGA94_52 516586.275 7767421.301 451.073 DGPS 4/05/2014 AR ML29822 4/05/2014 4/05/2014 AR D Twin Bonanza OPTR0119 COST 63.819 MGA94_52 516616.892 7767359.647 451.834 DGPS 2/05/2014 PA ML29822 2/05/2014 2/05/2014 JI D Twin Bonanza OPTR0119A COST 118.375 MGA94_52 516699.205 7767357.871 453.012 DGPS 2/05/2014 PA ML29822 2/05/2014 2/05/2014 JI D Twin Bonanza OPTR0120 COST 58.266 MGA94_52 516765.318 7767344.837 454.129 DGPS 2/05/2014 PA ML29822 2/05/2014 2/05/2014 JI D Twin Bonanza OPTR0121 COST 49.92 MGA94_52 516774.839 7767329.865 454.523 DGPS 2/05/2014 PA ML29822 2/05/2014 2/05/2014 PA D Twin Bonanza OPTR0122 COST 57.862 MGA94_52 516595.061 7767296.828 451.623 DGPS 6/05/2014 PA ML29822 6/05/2014 6/05/2014 PA D Twin Bonanza OPTR0123 COST 71.632 MGA94_52 516605.148 7767215.842 451.474 DGPS 6/05/2014 ML29822 6/05/2014 6/05/2014 JI D Twin Bonanza OPTR0123A COST 13.811 MGA94_52 516606.806 7767214.326 451.252 DGPS 6/05/2014 JI ML29822 6/05/2014 6/05/2014 JI D Twin Bonanza OPTR0124 COST 75.67 MGA94_52 516591.809 7767154.063 451.232 DGPS 4/05/2014 AR ML29822 4/05/2014 4/05/2014 AR D Twin Bonanza OPTR0124A COST 70.381 MGA94_52 516688.264 7767157.758 452.377 DGPS 4/05/2014 AR ML29822 4/05/2014 4/05/2014 AR D Twin Bonanza OPTR0125 COST 229.229 MGA94_52 516644.026 7767005.747 451.788 DGPS 5/05/2014 JI ML29822 5/05/2014 5/05/2014 JI D Twin Bonanza OPTR0126 COST 29.577 MGA94_52 516723.801 7766992.418 453.16 DGPS 5/05/2014 PA ML29822 5/05/2014 5/05/2014 PA D Twin Bonanza OPTR0127 COST 51.536 MGA94_52 516732.613 7766981.292 453.467 DGPS 5/05/2014 JI ML29822 5/05/2014 5/05/2014 JI D Twin Bonanza OPTR0128 COST 243.816 MGA94_52 516700.284 7766845.673 451.696 DGPS 1/05/2014 AR ML29822 1/05/2014 1/05/2014 AR D Twin Bonanza OPTR0129 COST 31.117 MGA94_52 516608.996 7767891.595 449.637 DGPS 3/05/2014 AR ML29822 3/05/2014 3/05/2014 PA D Twin Bonanza OPTR0130 COST 46.497 MGA94_52 516600.579 7767854.999 449.764 DGPS 3/05/2014 AR ML29822 3/05/2014 3/05/2014 AR D Twin Bonanza OPTR0131 COST 29.047 MGA94_52 516275.443 7768783.268 442.604 DGPS 7/05/2014 PS ML29822 18/05/2014 18/05/2014 LM D Twin Bonanza OPTR0132 COST 35.544 MGA94_52 516287.581 7768746.457 442.973 DGPS 20/05/2014 KE ML29822 20/05/2014 20/05/2014 KE D Twin Bonanza OPTR0133 COST 46.735 MGA94_52 516365.35 7768508.472 446.224 DGPS 20/05/2014 KE ML29822 20/05/2014 20/05/2014 KE D Twin Bonanza OPTR0134 COST 6.562 MGA94_52 516508.964 7768072.4 448.796 DGPS 17/06/2014 ML29822 21/05/2014 21/05/2014 D Twin Bonanza OPTR0135 COST 4.322 MGA94_52 516518.196 7768059.044 449.071 DGPS 20/05/2014 KE ML29822 21/05/2014 21/05/2014 KE D Twin Bonanza OPTR0136 COST 2.995 MGA94_52 516530.925 7768042.433 448.904 DGPS 21/05/2014 KE ML29822 21/05/2014 21/05/2014 KE D Twin Bonanza OPTR0137 COST 40.9 MGA94_52 516513.787 7768031.067 447.917 DGPS 22/05/2014 KE ML29822 22/05/2014 22/05/2014 KE D Twin Bonanza OPTR0138 COST 103.813 MGA94_52 516705.934 7767747.274 450.779 DGPS 22/05/2014 KE ML29822 22/05/2014 23/05/2014 KE D Twin Bonanza OPTR0139 COST 172.679 MGA94_52 516820 7766942 453.372 DGPS 4/06/2014 PS ML29822 4/06/2014 4/06/2014 PS D Twin Bonanza OPTR0140 COST 100 MGA94_52 516762.624 7766859.522 452.053 DGPS 18/06/2014 KE ML29822 18/06/2014 18/06/2014 KE