H0002 Version 1 H0003 Date_generated 4-Dec-13 H0004 Reporting_period_end_date 30-Oct-12 H0005 State NT H0100 Tenement_no or Combined_rept_no GR 164-13 H0102 Project_name Old Pirate H0150 250K_map_sheet_number "SF 52-15, SF 52-03" H0151 100K_map_sheet_number "4758, 4757, 4857" H0500 Feature_type Drillhole Collar H0501 Geodetic_datum GDA94 H0502 Vertical_datum AHD H0503 Projection MGA H0508 Local_grid_name N/A H0530 Coordinate_system Projected H0531 Projection_zone 52 H0532 Surveying_instrument N/A H0533 Surveying_company N/A H1000 DataSet Trench Hole_ID Trench Hole_Type Max_Depth Length Orig_Grid_ID Easting Northing RL Date_Started Date_Completed D Twin Bonanza OPBS100001 COST 9.922 MGA94_52 516750.949 7766966.38 453.534 28/06/2013 29/06/2013 D Twin Bonanza OPBS100016 COST 7.149 MGA94_52 516758.814 7766971.221 453.555 28/06/2013 28/06/2013 D Twin Bonanza OPBS100026 COST 8.265 MGA94_52 516753.65 7766963.857 453.108 28/06/2013 28/06/2013 D Twin Bonanza OPBS100036 COST 7.035 MGA94_52 516760.616 7766968.229 453.154 28/06/2013 28/06/2013 D Twin Bonanza OPBS100044 COST 8.028 MGA94_52 516756.407 7766959.432 452.982 28/06/2013 28/06/2013 D Twin Bonanza OPBS100054 COST 4.888 MGA94_52 516763.302 7766963.575 453.164 28/06/2013 28/06/2013 D Twin Bonanza OPBS100061 COST 9.906 MGA94_52 516756.735 7766956.078 453.825 29/06/2013 29/06/2013 D Twin Bonanza OPBS100072 COST 4.827 MGA94_52 516764.687 7766961.404 453.574 29/06/2013 29/06/2013 D Twin Bonanza OPBS100077 COST 3.1 MGA94_52 516774.787 7766930.427 453.633 7/06/2013 7/06/2013 D Twin Bonanza OPBS100082 COST 2.112 MGA94_52 516768.924 7766963.526 453.433 29/06/2013 29/06/2013 D Twin Bonanza OPBS100095 COST 8.045 MGA94_52 516782.93 7766921.605 453.288 7/06/2013 7/06/2013 D Twin Bonanza OPBS100107 COST 9.038 MGA94_52 516758.447 7766953.789 452.822 7/07/2013 7/07/2013 D Twin Bonanza OPBS100120 COST 8.057 MGA94_52 516760.646 7766950.429 452.947 7/07/2013 7/07/2013 D Twin Bonanza OPBS100131 COST 13.868 MGA94_52 516714.807 7767802.236 452.313 7/07/2013 7/07/2013 D Twin Bonanza OPBS100143 COST 8.995 MGA94_52 516717.254 7767836.539 452.378 7/08/2013 7/08/2013 D Twin Bonanza OPBS100158 COST 6.946 MGA94_52 516798.792 7766887.284 453.204 7/08/2013 7/08/2013 D Twin Bonanza OPBS100175 COST 3.809 MGA94_52 516700.435 7767687.978 451.727 7/09/2013 7/08/2013 D Twin Bonanza OPBS100184 COST 2.856 MGA94_52 516700.255 7767687.705 451.653 7/09/2013 7/08/2013 D Twin Bonanza OPBS100191 COST 17.182 MGA94_52 516694.593 7767680.251 452.086 10/07/2013 10/07/2013 D Twin Bonanza OPBS100216 COST 17.022 MGA94_52 516697.7 7767672.24 452.188 11/07/2013 11/07/2013 D Twin Bonanza OPBS100239 COST 4.757 MGA94_52 516705.698 7767668.483 452.352 11/07/2013 11/07/2013 D Twin Bonanza OPBS100245 COST 27.926 MGA94_52 516744.055 7766920.259 452.479 13/07/2013 13/07/2013 D Twin Bonanza OPBS100262 COST 25.132 MGA94_52 516747.781 7766916.622 452.505 13/07/2013 13/07/2013 D Twin Bonanza OPBS100275 COST 38.346 MGA94_52 516792 7766893.126 453.049 13/07/2013 13/07/2013 D Twin Bonanza OPBS100298 COST 11.464 MGA94_52 516791.917 7766893.049 452.81 14/07/2013 14/07/2013 D Twin Bonanza OPBS100312 COST 25.749 MGA94_52 516803.088 7766896.41 452.834 14/07/2013 14/07/2013 D Twin Bonanza OPBS100331 COST 62.945 MGA94_52 516602.763 7767799.284 450.373 25/07/2013 26/07/2013 D Twin Bonanza OPBS100361 COST 84.142 MGA94_52 516665.552 7767799.524 451.413 26/07/2013 26/07/2013 D Twin Bonanza OPBS100385 COST 124.393 MGA94_52 516607.488 7767840.293 450.595 27/07/2013 27/07/2013 D Twin Bonanza OPBS100401 COST 8.997 MGA94_52 516768.402 7766954.93 453.172 15/07/2013 16/07/2013 D Twin Bonanza OPBS100415 COST 9.53 MGA94_52 516770.825 7766950.562 453.173 16/07/2013 16/07/2013 D Twin Bonanza OPBS100424 COST 6.589 MGA94_52 516768.408 7766954.941 453.166 15/07/2013 16/07/2013 D Twin Bonanza OPBS100431 COST 6.05 MGA94_52 516770.889 7766950.505 453.177 15/07/2013 16/07/2013 D Twin Bonanza OPBS100444 COST 5.221 MGA94_52 516773.347 7766946.191 453.098 15/07/2013 19/07/2013 D Twin Bonanza OPBS100451 COST 4.176 MGA94_52 516775.715 7766941.837 453.12 19/07/2013 19/07/2013 D Twin Bonanza OPBS100460 COST 4.509 MGA94_52 516778.209 7766937.551 453.035 19/07/2013 19/07/2013 D Twin Bonanza OPBS100465 COST 10.029 MGA94_52 516773.325 7766946.17 453.108 15/07/2013 16/07/2013 D Twin Bonanza OPBS100481 COST 9.786 MGA94_52 516775.72 7766941.822 453.13 19/07/2013 19/07/2013 D Twin Bonanza OPBS100493 COST 9.895 MGA94_52 516778.24 7766937.55 453.054 19/07/2013 19/07/2013 D Twin Bonanza OPBS100522 COST 4.614 MGA94_52 516780.77 7766933.249 453.061 18/07/2013 18/07/2013 D Twin Bonanza OPBS100529 COST 10.062 MGA94_52 516772.071 7766928.269 452.917 18/07/2013 18/07/2013 D Twin Bonanza OPBS100542 COST 9.97 MGA94_52 516774.629 7766923.944 452.914 22/07/2013 22/07/2013 D Twin Bonanza OPBS100558 COST 4.446 MGA94_52 516783.173 7766929.057 452.915 22/07/2013 22/07/2013 D Twin Bonanza OPBS100564 COST 9.867 MGA94_52 516777.244 7766919.891 452.839 18/07/2013 18/07/2013 D Twin Bonanza OPBS100575 COST 4.765 MGA94_52 516785.809 7766924.74 452.963 18/07/2013 18/07/2013 D Twin Bonanza OPBS100580 COST 9.689 MGA94_52 516779.919 7766915.507 452.769 22/07/2013 22/07/2013 D Twin Bonanza OPBS100594 COST 4.909 MGA94_52 516788.334 7766920.278 452.866 22/07/2013 22/07/2013 D Twin Bonanza OPBS100600 COST 9.813 MGA94_52 516782.303 7766911.175 452.647 19/07/2013 22/07/2013 D Twin Bonanza OPBS100614 COST 3.881 MGA94_52 516790.75 7766916.111 452.771 19/07/2013 19/07/2013 D Twin Bonanza OPBS100618 COST 11 MGA94_52 516784.594 7766906.841 452.613 22/07/2013 22/07/2013 D Twin Bonanza OPBS100630 COST 11.375 MGA94_52 516787.125 7766902.369 452.68 19/07/2013 22/07/2013 D Twin Bonanza OPBS100642 COST 9.959 MGA94_52 516789.635 7766897.892 452.81 19/07/2013 22/07/2013 D Twin Bonanza OPBS100650 LONGCALC 12.045 MGA94_52 516685.449 7767766.679 452.39 19/07/2013 19/07/2013 D Twin Bonanza OPBS100658 LONGCALC 2.5 MGA94_52 516643.629 7767802.728 451.634 24/07/2013 24/07/2013 D Twin Bonanza OPBS100659 LONGCALC 2.5 MGA94_52 516644.942 7767805.642 451.936 24/07/2013 24/07/2013 D Twin Bonanza OPBS100660 LONGCALC 4.28 MGA94_52 516616.815 7767896.962 451.374 24/07/2013 24/07/2013 D Twin Bonanza OPBS100662 LONGCALC 2.5 MGA94_52 516618.417 7767954.076 451.441 24/07/2013 24/07/2013 D Twin Bonanza OPBS100663 LONGCALC 2.5 MGA94_52 516618.426 7767959.071 451.438 24/07/2013 24/07/2013 D Twin Bonanza OPBS100664 LONGCALC 2.5 MGA94_52 516641.971 7767942.195 451.826 24/07/2013 24/07/2013 D Twin Bonanza OPBS100665 LONGCALC 2.5 MGA94_52 516641.006 7767950.945 451.754 24/07/2013 24/07/2013 D Twin Bonanza OPBS100666 COST 27.985 MGA94_52 516769.711 7766932.66 452.881 20/07/2013 20/07/2013 D Twin Bonanza OPBS100680 LONGCALC 17.484 MGA94_52 516441.337 7768342.596 447.846 20/07/2013 20/07/2013 D Twin Bonanza OPBS100688 LONGCALC 15.714 MGA94_52 516448.123 7768323.942 447.725 24/07/2013 24/07/2013 D Twin Bonanza OPBS100696 LONGCALC 26.113 MGA94_52 516453.332 7768300.679 448.093 24/07/2013 24/07/2013 D Twin Bonanza OPBS100742 COST 109.953 MGA94_52 516605.496 7767900.033 450.312 27/07/2013 27/07/2013 D Twin Bonanza OPBS100792 LONGCALC 21.788 MGA94_52 516656.253 7767766.633 452.361 2/08/2013 3/08/2013 D Twin Bonanza OPBS100802 LONGCALC 12.403 MGA94_52 516656.314 7767770.534 451.976 3/08/2013 3/08/2013 D Twin Bonanza OPBS100808 LONGCALC 2.5 MGA94_52 516654.068 7767768.279 451.955 2/08/2013 3/08/2013 D Twin Bonanza OPBS100809 LONGCALC 3.001 MGA94_52 516652.95 7767768.569 451.964 2/08/2013 3/08/2013 D Twin Bonanza OPBS100812 COST 15.772 MGA94_52 516758.497 7766953.816 452.798 2/08/2013 3/08/2013 D Twin Bonanza OPBS100828 LONGCALC 8.816 MGA94_52 516687.823 7767768.464 452.254 2/08/2013 3/08/2013 D Twin Bonanza OPBS100832 LONGCALC 1.718 MGA94_52 516687.226 7767775.993 452.399 3/08/2013 3/08/2013 D Twin Bonanza OPBS100834 LONGCALC 16.013 MGA94_52 516685.728 7767777.134 452.202 3/08/2013 3/08/2013 D Twin Bonanza OPBS100835 LONGCALC 2.5 MGA94_52 516686.04 7767783.756 452.281 3/08/2013 3/08/2013 D Twin Bonanza OPBS100837 LONGCALC 4.174 MGA94_52 516682.95 7767782.041 452.306 3/08/2013 3/08/2013 D Twin Bonanza OPBS100843 LONGCALC 2.5 MGA94_52 516679.917 7767789.679 452.208 3/08/2013 3/08/2013 D Twin Bonanza OPBS100844 LONGCALC 17.614 MGA94_52 516681.577 7767778.294 452.197 3/08/2013 3/08/2013 D Twin Bonanza OPBS100854 LONGCALC 2.5 MGA94_52 516678.541 7767806.051 450.98 4/08/2013 4/08/2013 D Twin Bonanza OPBS100855 LONGCALC 2.5 MGA94_52 516678.862 7767805.994 450.952 4/08/2013 4/08/2013 D Twin Bonanza OPBS100856 LONGCALC 2.5 MGA94_52 516680.053 7767806.83 450.928 4/08/2013 4/08/2013 D Twin Bonanza OPBS100857 LONGCALC 2.5 MGA94_52 516680.053 7767806.83 450.928 4/08/2013 4/08/2013 D Twin Bonanza OPBS100858 LONGCALC 2.5 MGA94_52 516683.388 7767806.416 451.025 7/08/2013 7/08/2013 D Twin Bonanza OPBS100859 LONGCALC 2.5 MGA94_52 516684.623 7767806.562 451.003 7/08/2013 7/08/2013 D Twin Bonanza OPBS100860 LONGCALC 2.5 MGA94_52 516683.99 7767806.902 451.055 7/08/2013 7/08/2013 D Twin Bonanza OPBS100861 LONGCALC 2.5 MGA94_52 516684.542 7767807.19 451.048 7/08/2013 7/08/2013 D Twin Bonanza OPBS100862 LONGCALC 9.378 MGA94_52 516720.778 7767834.081 452.168 7/08/2013 7/08/2013 D Twin Bonanza OPBS100863 LONGCALC 8.81 MGA94_52 516721.15 7767834.183 452.048 7/08/2013 7/08/2013 D Twin Bonanza OPBS100866 LONGCALC 2.5 MGA94_52 516676.171 7767839.609 451.263 7/08/2013 7/08/2013 D Twin Bonanza OPBS100867 LONGCALC 2.5 MGA94_52 516666.477 7767839.695 451.168 7/08/2013 7/08/2013 D Twin Bonanza OPBS100868 LONGCALC 2.5 MGA94_52 516632.889 7767842.189 450.899 7/08/2013 7/08/2013 D Twin Bonanza OPBS100869 LONGCALC 2.5 MGA94_52 516612.596 7767839.658 450.484 7/08/2013 7/08/2013 D Twin Bonanza OPBS100870 LONGCALC 2.5 MGA94_52 516683.34 7767807.122 451.1 7/08/2013 7/08/2013 D Twin Bonanza OPBS100871 LONGCALC 2.5 MGA94_52 516679.615 7767799.236 450.893 7/08/2013 7/08/2013 D Twin Bonanza OPBS100872 LONGCALC 2.5 MGA94_52 516646.842 7767799.281 450.76 7/08/2013 7/08/2013 D Twin Bonanza OPBS100873 LONGCALC 2.5 MGA94_52 516722.707 7767825.188 451.568 7/08/2013 7/08/2013 D Twin Bonanza OPBS100874 LONGCALC 2.5 MGA94_52 516618.978 7767899.551 450.32 7/08/2013 7/08/2013 D Twin Bonanza OPBS100875 LONGCALC 2.5 MGA94_52 516620.166 7767899.597 450.359 7/08/2013 7/08/2013 D Twin Bonanza OPBS100876 LONGCALC 2.5 MGA94_52 516621.159 7767899.548 450.618 7/08/2013 7/08/2013 D Twin Bonanza OPBS100877 LONGCALC 2.5 MGA94_52 516630.394 7767899.674 450.516 7/08/2013 7/08/2013 D Twin Bonanza OPBS100878 LONGCALC 2.5 MGA94_52 516631.938 7767899.888 450.561 7/08/2013 7/08/2013 D Twin Bonanza OPBS100879 LONGCALC 2.5 MGA94_52 516639.346 7767899.88 450.79 7/08/2013 7/08/2013 D Twin Bonanza OPBS100880 LONGCALC 2.5 MGA94_52 516653.761 7767899.891 451.125 7/08/2013 7/08/2013 D Twin Bonanza OPBS100881 LONGCALC 2.5 MGA94_52 516671.222 7767900.148 451.421 7/08/2013 7/08/2013 D Twin Bonanza OPBS100883 COST 8.297 MGA94_52 516646.967 7767782.36 451.193 5/08/2013 7/08/2013 D Twin Bonanza OPBS100893 COST 5.541 MGA94_52 516653.248 7767765.562 451.34 5/08/2013 5/08/2013 D Twin Bonanza OPBS100903 COST 5.544 MGA94_52 516653.037 7767766.313 451.568 5/08/2013 5/08/2013 D Twin Bonanza OPBS100911 LONGCALC 20.666 MGA94_52 516671.953 7767810.119 452.206 6/08/2013 7/08/2013 D Twin Bonanza OPBS100924 LONGCALC 2.5 MGA94_52 516640.623 7767861.101 451.459 6/08/2013 7/08/2013 D Twin Bonanza OPBS100925 LONGCALC 2.5 MGA94_52 516640.51 7767860.947 451.558 6/08/2013 7/08/2013 D Twin Bonanza OPBS100926 LONGCALC 2.5 MGA94_52 516635.701 7767883.969 451.206 6/08/2013 7/08/2013 D Twin Bonanza OPBS100927 LONGCALC 2.5 MGA94_52 516636.482 7767884.932 451.288 6/08/2013 7/08/2013 D Twin Bonanza OPBS100928 COST 13.421 MGA94_52 516630.704 7767853.758 451.157 7/08/2013 7/08/2013 D Twin Bonanza OPBS100941 LONGCALC 2.5 MGA94_52 516637.046 7767852.983 451.382 7/08/2013 7/08/2013 D Twin Bonanza OPBS100942 LONGCALC 2.5 MGA94_52 516640.501 7767852.67 451.219 7/08/2013 7/08/2013 D Twin Bonanza OPBS100943 COST 6.878 MGA94_52 516719.4 7767870.624 451.561 11/08/2013 11/08/2013 D Twin Bonanza OPBS100950 COST 0.297 MGA94_52 516724.344 7767870.713 451.123 14/08/2013 14/08/2013 D Twin Bonanza OPBS100951 COST 42.853 MGA94_52 516601.611 7767972.8 450.197 11/08/2013 11/08/2013 D Twin Bonanza OPBS100974 LONGCALC 11.417 MGA94_52 516635.256 7767841.333 451.053 11/08/2013 11/08/2013 D Twin Bonanza OPBS100975 LONGCALC 2.5 MGA94_52 516636.671 7767839.723 450.814 11/08/2013 11/08/2013 D Twin Bonanza OPBS100976 LONGCALC 2.5 MGA94_52 516638.96 7767831.137 451.268 11/08/2013 11/08/2013 D Twin Bonanza OPBS100978 LONGCALC 2.21 MGA94_52 516642.88 7767809.173 450.969 14/08/2013 14/08/2013 D Twin Bonanza OPBS100979 LONGCALC 2.5 MGA94_52 516625.248 7767824.997 451.236 14/08/2013 14/08/2013 D Twin Bonanza OPBS100980 LONGCALC 2.5 MGA94_52 516620.06 7767829.574 450.907 14/08/2013 14/08/2013 D Twin Bonanza OPBS100981 LONGCALC 2.5 MGA94_52 516604.623 7767842.053 450.952 14/08/2013 14/08/2013 D Twin Bonanza OPBS100982 LONGCALC 2.5 MGA94_52 516603.919 7767842.091 450.888 14/08/2013 14/08/2013 D Twin Bonanza OPBS100983 LONGCALC 2.5 MGA94_52 516603.284 7767879.331 450.679 14/08/2013 14/08/2013 D Twin Bonanza OPBS100984 LONGCALC 2.5 MGA94_52 516591.555 7767917.931 450.77 14/08/2013 14/08/2013 D Twin Bonanza OPBS100985 LONGCALC 2.5 MGA94_52 516625.582 7767937.879 450.786 14/08/2013 14/08/2013 D Twin Bonanza OPBS100986 LONGCALC 2.5 MGA94_52 516624.053 7767938.966 450.379 14/08/2013 14/08/2013 D Twin Bonanza OPBS100987 LONGCALC 2.5 MGA94_52 516618.376 7767962.547 450.224 14/08/2013 14/08/2013 D Twin Bonanza OPBS100988 LONGCALC 2.5 MGA94_52 516614.72 7767963.678 450.026 14/08/2013 14/08/2013 D Twin Bonanza OPBS100989 LONGCALC 2.5 MGA94_52 516613.599 7767981.031 450.034 14/08/2013 14/08/2013 D Twin Bonanza OPBS100991 LONGCALC 2.5 MGA94_52 516637.003 7768042.576 449.999 14/08/2013 14/08/2013 D Twin Bonanza OPBS100992 LONGCALC 2.5 MGA94_52 516643.376 7767865.897 451.182 14/08/2013 14/08/2013 D Twin Bonanza OPBS100993 COST 9.271 MGA94_52 516715.129 7767746.694 451.302 12/08/2013 12/08/2013 D Twin Bonanza OPBS101001 COST 9.413 MGA94_52 516712.913 7767736.861 451.649 12/08/2013 12/08/2013 D Twin Bonanza OPBS101009 COST 8.742 MGA94_52 516711.639 7767726.968 451.287 12/08/2013 12/08/2013 D Twin Bonanza OPBS101017 COST 8.986 MGA94_52 516709.013 7767717.341 451.465 13/08/2013 14/08/2013 D Twin Bonanza OPBS101024 LONGCALC 73.5 MGA94_52 516459.357 7768277.286 448.152 14/08/2013 14/08/2013 D Twin Bonanza OPBS101061 LONGCALC 71.031 MGA94_52 516480.865 7768206.598 448.621 14/08/2013 17/08/2013 D Twin Bonanza OPBS101096 COST 9.401 MGA94_52 516699.141 7767709.115 452.107 15/08/2013 15/08/2013 D Twin Bonanza OPBS101103 COST 6.607 MGA94_52 516708.173 7767707.406 451.39 15/08/2013 15/08/2013 D Twin Bonanza OPBS101109 COST 10 MGA94_52 516697.531 7767704.079 452.786 17/08/2013 17/08/2013 D Twin Bonanza OPBS101120 COST 8.626 MGA94_52 516697.9 7767699.101 451.991 15/08/2013 15/08/2013 D Twin Bonanza OPBS101128 COST 4.936 MGA94_52 516706.46 7767697.518 451.473 15/08/2013 15/08/2013 D Twin Bonanza OPBS101131 COST 7.958 MGA94_52 516697.196 7767688.904 451.534 15/08/2013 15/08/2013 D Twin Bonanza OPBS101141 COST 4.722 MGA94_52 516704.99 7767688.93 451.166 15/08/2013 15/08/2013 D Twin Bonanza OPBS101145 LONGCALC 39.429 MGA94_52 516717.881 7767752.51 451.583 16/08/2013 16/08/2013 D Twin Bonanza OPBS101159 LONGCALC 5.982 MGA94_52 516706.766 7767714.724 452.708 17/08/2013 17/08/2013 D Twin Bonanza OPBS101162 LONGCALC 7.59 MGA94_52 516705.121 7767707.653 451.22 17/08/2013 17/08/2013 D Twin Bonanza OPBS101164 LONGCALC 1.632 MGA94_52 516706.259 7767711.474 451.551 17/08/2013 17/08/2013 D Twin Bonanza OPBS101166 LONGCALC 2.5 MGA94_52 516702.642 7767704.636 451.119 17/08/2013 17/08/2013 D Twin Bonanza OPBS101167 LONGCALC 2.5 MGA94_52 516701.957 7767701.186 451.254 17/08/2013 17/08/2013 D Twin Bonanza OPBS101168 LONGCALC 3.066 MGA94_52 516700.206 7767702.727 451.348 17/08/2013 17/08/2013 D Twin Bonanza OPBS101170 LONGCALC 2.5 MGA94_52 516699.608 7767698.782 451.466 17/08/2013 17/08/2013 D Twin Bonanza OPBS101171 LONGCALC 2.5 MGA94_52 516701.808 7767691.074 451.265 17/08/2013 17/08/2013 D Twin Bonanza OPBS101172 LONGCALC 2.5 MGA94_52 516700.131 7767686.893 451.166 17/08/2013 17/08/2013 D Twin Bonanza OPBS101173 LONGCALC 3.644 MGA94_52 516695.802 7767693.63 452.614 17/08/2013 17/08/2013 D Twin Bonanza OPBS101175 LONGCALC 2.5 MGA94_52 516699.766 7767685.798 451.27 17/08/2013 17/08/2013 D Twin Bonanza OPBS101176 COST 4.827 MGA94_52 516710.752 7767768.756 451.928 18/08/2013 18/08/2013 D Twin Bonanza OPBS101180 COST 9.649 MGA94_52 516711.657 7767777.972 451.869 18/08/2013 18/08/2013 D Twin Bonanza OPBS101186 COST 4.911 MGA94_52 516712.499 7767788.123 451.937 18/08/2013 18/08/2013 D Twin Bonanza OPBS101192 COST 4.053 MGA94_52 516713.338 7767794.442 452.167 18/08/2013 18/08/2013 D Twin Bonanza OPBS101198 LONGCALC 24.742 MGA94_52 516716.483 7767793.49 451.893 18/08/2013 18/08/2013 D Twin Bonanza OPBS101207 COST 6.312 MGA94_52 516717.696 7767799.491 452.049 18/08/2013 18/08/2013 D Twin Bonanza OPBS101212 COST 5.045 MGA94_52 516718.88 7767807.226 451.926 18/08/2013 18/08/2013 D Twin Bonanza OPBS101218 COST 4.813 MGA94_52 516720.49 7767816.909 451.807 18/08/2013 18/08/2013 D Twin Bonanza OPBS101225 COST 4.583 MGA94_52 516720.724 7767827.566 451.885 18/08/2013 18/08/2013 D Twin Bonanza OPBS101231 LONGCALC 9.238 MGA94_52 516722.206 7767827.36 451.454 18/08/2013 18/08/2013 D Twin Bonanza OPBS101232 LONGCALC 2.756 MGA94_52 516723.101 7767824.797 451.62 18/08/2013 18/08/2013 D Twin Bonanza OPBS101238 LONGCALC 7.409 MGA94_52 516722.734 7767815.188 451.67 18/08/2013 18/08/2013 D Twin Bonanza OPBS101242 LONGCALC 2.5 MGA94_52 516721.822 7767811.538 451.662 18/08/2013 18/08/2013 D Twin Bonanza OPBS101244 LONGCALC 2.5 MGA94_52 516718.958 7767800.495 451.68 18/08/2013 18/08/2013 D Twin Bonanza OPBS101245 COST 3.934 MGA94_52 516722.039 7767890.368 451.73 19/08/2013 19/08/2013 D Twin Bonanza OPBS101251 COST 4.325 MGA94_52 516721.024 7767895.245 451.42 19/08/2013 19/08/2013 D Twin Bonanza OPBS101257 COST 4.588 MGA94_52 516719.939 7767905.398 451.416 19/08/2013 19/08/2013 D Twin Bonanza OPBS101262 COST 5.224 MGA94_52 516719.395 7767914.838 451.135 19/08/2013 19/08/2013 D Twin Bonanza OPBS101270 COST 7.298 MGA94_52 516718.289 7767925.002 450.974 19/08/2013 19/08/2013 D Twin Bonanza OPBS101280 COST 7.261 MGA94_52 516719.299 7767935.275 451.369 19/08/2013 19/08/2013 D Twin Bonanza OPBS101287 LONGCALC 13.418 MGA94_52 516722.444 7767933.514 451.128 20/08/2013 20/08/2013 D Twin Bonanza OPBS101290 LONGCALC 2.5 MGA94_52 516723.203 7767922.201 451.106 20/08/2013 20/08/2013 D Twin Bonanza OPBS101291 LONGCALC 2.5 MGA94_52 516720.957 7767932.496 451.102 21/08/2013 21/08/2013 D Twin Bonanza OPBS101292 LONGCALC 2.5 MGA94_52 516721.203 7767929.464 451.036 21/08/2013 21/08/2013 D Twin Bonanza OPBS101295 LONGCALC 2.5 MGA94_52 516721.653 7767916.687 451.016 21/08/2013 21/08/2013 D Twin Bonanza OPBS101296 LONGCALC 14.222 MGA94_52 516721.801 7767913.454 451.207 21/08/2013 21/08/2013 D Twin Bonanza OPBS101299 COST 4.168 MGA94_52 516716.92 7767974.635 451.209 19/08/2013 19/08/2013 D Twin Bonanza OPBS101305 COST 3.856 MGA94_52 516716.106 7767984.331 451.411 19/08/2013 19/08/2013 D Twin Bonanza OPBS101311 LONGCALC 13.99 MGA94_52 516717.453 7767984.694 451.173 20/08/2013 20/08/2013 D Twin Bonanza OPBS101315 COST 4.219 MGA94_52 516676.628 7767804.286 451.253 21/08/2013 21/08/2013 D Twin Bonanza OPBS101320 COST 3.923 MGA94_52 516675.402 7767815.172 451.033 21/08/2013 21/08/2013 D Twin Bonanza OPBS101324 COST 4.917 MGA94_52 516674.238 7767824.684 451.134 12/08/2013 12/08/2013 D Twin Bonanza OPBS101332 COST 4.596 MGA94_52 516673.482 7767835.359 451.212 21/08/2013 21/08/2013 D Twin Bonanza OPBS101339 LONGCALC 2.5 MGA94_52 516675.805 7767832.58 451.083 21/08/2013 21/08/2013 D Twin Bonanza OPBS101340 LONGCALC 2.5 MGA94_52 516675.859 7767826.772 451.052 21/08/2013 21/08/2013 D Twin Bonanza OPBS101341 LONGCALC 2.5 MGA94_52 516676.911 7767817.566 451.091 21/08/2013 21/08/2013 D Twin Bonanza OPBS101342 LONGCALC 4.822 MGA94_52 516678.256 7767814.403 450.972 21/08/2013 21/08/2013 D Twin Bonanza OPBS101344 LONGCALC 2.5 MGA94_52 516678.36 7767805.512 451.158 24/08/2013 24/08/2013 D Twin Bonanza OPBS101345 LONGCALC 2.5 MGA94_52 516674.212 7767829.511 451.154 24/08/2013 24/08/2013 D Twin Bonanza OPBS101346 LONGCALC 2.5 MGA94_52 516675.587 7767822.59 451.114 24/08/2013 24/08/2013 D Twin Bonanza OPBS101347 COST 4.736 MGA94_52 516646.296 7767794.735 450.344 23/08/2013 23/08/2013 D Twin Bonanza OPBS101354 COST 5.016 MGA94_52 516643.731 7767803.524 450.418 23/08/2013 23/08/2013 D Twin Bonanza OPBS101360 COST 6.037 MGA94_52 516640.019 7767811.997 450.723 23/08/2013 23/08/2013 D Twin Bonanza OPBS101370 COST 9.919 MGA94_52 516633.586 7767820.516 450.092 23/08/2013 23/08/2013 D Twin Bonanza OPBS101380 COST 5.774 MGA94_52 516635.066 7767833.074 450.742 23/08/2013 23/08/2013 D Twin Bonanza OPBS101390 COST 6.247 MGA94_52 516633.437 7767843.156 451.406 23/08/2013 23/08/2013 D Twin Bonanza OPBS101396 COST 7.942 MGA94_52 516633.497 7767820.713 450.128 23/08/2013 23/08/2013 D Twin Bonanza OPBS101402 COST 6.551 MGA94_52 516632.986 7767813.159 450.218 23/08/2013 23/08/2013 D Twin Bonanza OPBS101408 COST 5.257 MGA94_52 516618.772 7767826.552 450.237 23/08/2013 23/08/2013 D Twin Bonanza OPBS101413 COST 3.27 MGA94_52 516623.412 7767828.964 450.16 23/08/2013 23/08/2013 D Twin Bonanza OPBS101415 COST 7.011 MGA94_52 516616.42 7767829.484 450.416 24/08/2013 24/08/2013 D Twin Bonanza OPBS101422 LONGCALC 8.032 MGA94_52 516618.601 7767830.804 450.409 24/08/2013 24/08/2013 D Twin Bonanza OPBS101424 LONGCALC 6.313 MGA94_52 516624.2 7767825.556 450.364 24/08/2013 24/08/2013 D Twin Bonanza OPBS101427 LONGCALC 2.949 MGA94_52 516630.525 7767819.71 450.292 24/08/2013 24/08/2013 D Twin Bonanza OPBS101430 LONGCALC 2.5 MGA94_52 516632.831 7767822.003 450.451 24/08/2013 24/08/2013 D Twin Bonanza OPBS101431 LONGCALC 2.5 MGA94_52 516634.609 7767836.422 451.331 24/08/2013 24/08/2013 D Twin Bonanza OPBS101436 LONGCALC 4.401 MGA94_52 516638.907 7767830.802 450.683 24/08/2013 24/08/2013 D Twin Bonanza OPBS101439 LONGCALC 2.5 MGA94_52 516640.69 7767826.39 450.66 24/08/2013 24/08/2013 D Twin Bonanza OPBS101440 LONGCALC 2.5 MGA94_52 516641.326 7767823.639 450.732 24/08/2013 24/08/2013 D Twin Bonanza OPBS101441 LONGCALC 7.877 MGA94_52 516639.404 7767824.865 450.468 24/08/2013 24/08/2013 D Twin Bonanza OPBS101444 LONGCALC 2.5 MGA94_52 516643.997 7767816.78 450.67 24/08/2013 24/08/2013 D Twin Bonanza OPBS101446 LONGCALC 5.366 MGA94_52 516644.316 7767810.781 450.499 24/08/2013 24/08/2013 D Twin Bonanza OPBS101447 LONGCALC 2.5 MGA94_52 516646.137 7767809.376 450.511 24/08/2013 24/08/2013 D Twin Bonanza OPBS101448 LONGCALC 2.5 MGA94_52 516647.226 7767806.383 450.375 24/08/2013 24/08/2013 D Twin Bonanza OPBS101451 LONGCALC 2.5 MGA94_52 516648.334 7767804.429 450.27 24/08/2013 24/08/2013 D Twin Bonanza OPBS101452 LONGCALC 2.5 MGA94_52 516645.75 7767810.127 450.686 24/08/2013 24/08/2013 D Twin Bonanza OPBS101453 COST 5.776 MGA94_52 516634.591 7767865.014 450.839 24/08/2013 24/08/2013 D Twin Bonanza OPBS101459 COST 7.813 MGA94_52 516640.285 7767865.287 450.878 24/08/2013 24/08/2013 D Twin Bonanza OPBS101467 COST 5.937 MGA94_52 516634.202 7767875.283 450.763 24/08/2013 24/08/2013 D Twin Bonanza OPBS101471 COST 8.337 MGA94_52 516640.084 7767875.629 450.67 25/08/2013 25/08/2013 D Twin Bonanza OPBS101476 COST 6.79 MGA94_52 516633.267 7767885.474 450.984 25/08/2013 25/08/2013 D Twin Bonanza OPBS101481 COST 7.16 MGA94_52 516640.017 7767884.819 450.801 25/08/2013 25/08/2013 D Twin Bonanza OPBS101487 LONGCALC 23.753 MGA94_52 516642.981 7767890.738 450.891 25/08/2013 25/08/2013 D Twin Bonanza OPBS101492 LONGCALC 2.5 MGA94_52 516644.655 7767860.003 450.938 28/08/2013 28/08/2013 D Twin Bonanza OPBS101493 LONGCALC 2.5 MGA94_52 516641.715 7767858.577 451.015 28/08/2013 28/08/2013 D Twin Bonanza OPBS101494 LONGCALC 2.5 MGA94_52 516641.114 7767859.945 450.98 28/08/2013 28/08/2013 D Twin Bonanza OPBS101495 LONGCALC 2.5 MGA94_52 516636.558 7767860.699 450.98 28/08/2013 28/08/2013 D Twin Bonanza OPBS101496 LONGCALC 7.548 MGA94_52 516637.006 7767867.839 450.774 28/08/2013 28/08/2013 D Twin Bonanza OPBS101498 LONGCALC 2.5 MGA94_52 516636.156 7767880.357 450.756 28/08/2013 28/08/2013 D Twin Bonanza OPBS101501 LONGCALC 12.495 MGA94_52 516788.392 7766912.647 452.677 24/08/2013 28/08/2013 D Twin Bonanza OPBS101508 COST 5.213 MGA94_52 516640.011 7767894.864 450.859 27/08/2013 27/08/2013 D Twin Bonanza OPBS101514 COST 5.285 MGA94_52 516637.76 7767903.403 450.738 27/08/2013 27/08/2013 D Twin Bonanza OPBS101522 COST 4.31 MGA94_52 516633.666 7767914.551 450.771 27/08/2013 27/08/2013 D Twin Bonanza OPBS101528 COST 5.59 MGA94_52 516632.37 7767924.587 450.545 28/08/2013 28/08/2013 D Twin Bonanza OPBS101534 COST 4.583 MGA94_52 516631.22 7767934.818 450.543 27/08/2013 27/08/2013 D Twin Bonanza OPBS101540 COST 4.129 MGA94_52 516630.772 7767940.246 450.488 31/08/2013 31/08/2013 D Twin Bonanza OPBS101544 LONGCALC 28.913 MGA94_52 516632.748 7767934.129 450.25 28/08/2013 28/08/2013 D Twin Bonanza OPBS101548 LONGCALC 11.642 MGA94_52 516641.779 7767900.27 450.935 31/08/2013 31/08/2013 D Twin Bonanza OPBS101550 COST 4.775 MGA94_52 516634.475 7768040.638 450.141 29/08/2013 31/08/2013 D Twin Bonanza OPBS101553 COST 4.411 MGA94_52 516634.514 7768035.302 450.159 29/08/2013 31/08/2013 D Twin Bonanza OPBS101557 COST 4.33 MGA94_52 516634.429 7768030.664 450.118 31/08/2013 31/08/2013 D Twin Bonanza OPBS101562 COST 4.01 MGA94_52 516634.181 7768020.581 450.047 29/08/2013 31/08/2013 D Twin Bonanza OPBS101568 COST 3.587 MGA94_52 516634.405 7768010.871 450.119 29/08/2013 31/08/2013 D Twin Bonanza OPBS101572 COST 5.013 MGA94_52 516635.271 7768001.276 450.194 29/08/2013 31/08/2013 D Twin Bonanza OPBS101580 COST 5.573 MGA94_52 516635.668 7767991.18 450.232 29/08/2013 31/08/2013 D Twin Bonanza OPBS101585 LONGCALC 2.5 MGA94_52 516638.545 7767988.37 450.064 29/08/2013 31/08/2013 D Twin Bonanza OPBS101586 LONGCALC 2.5 MGA94_52 516637.418 7767994.354 450.135 29/08/2013 31/08/2013 D Twin Bonanza OPBS101587 LONGCALC 5.956 MGA94_52 516638.736 7768001.952 450.08 29/08/2013 31/08/2013 D Twin Bonanza OPBS101590 LONGCALC 6.315 MGA94_52 516637.069 7768011.691 450.05 31/08/2013 31/08/2013 D Twin Bonanza OPBS101593 LONGCALC 8.742 MGA94_52 516636.676 7768021.483 450.026 31/08/2013 31/08/2013 D Twin Bonanza OPBS101598 LONGCALC 2.016 MGA94_52 516636.872 7768032.198 450.004 31/08/2013 31/08/2013 D Twin Bonanza OPBS101600 COST 4.35 MGA94_52 516620.538 7767922.453 451.23 31/08/2013 31/08/2013 D Twin Bonanza OPBS101606 COST 5.127 MGA94_52 516619.499 7767928.634 450.111 31/08/2013 31/08/2013 D Twin Bonanza OPBS101610 COST 9.646 MGA94_52 516617.216 7767938.213 450.099 31/08/2013 31/08/2013 D Twin Bonanza OPBS101620 COST 11.052 MGA94_52 516612.548 7767947.543 450.212 31/08/2013 31/08/2013 D Twin Bonanza OPBS101630 COST 7.101 MGA94_52 516613.476 7767958.193 450.078 31/08/2013 31/08/2013 D Twin Bonanza OPBS101638 COST 5.532 MGA94_52 516611.759 7767967.705 449.908 31/08/2013 31/08/2013 D Twin Bonanza OPBS101644 COST 4.747 MGA94_52 516610.06 7767976.96 449.828 2/09/2013 4/09/2013 D Twin Bonanza OPBS101652 COST 6.96 MGA94_52 516608.876 7767986.697 449.96 2/09/2013 4/09/2013 D Twin Bonanza OPBS101659 COST 5.417 MGA94_52 516607.524 7767995.452 450.126 2/09/2013 4/09/2013 D Twin Bonanza OPBS101664 COST 5.137 MGA94_52 516587.211 7767920.424 450.378 7/09/2013 7/09/2013 D Twin Bonanza OPBS101670 COST 4.681 MGA94_52 516587.682 7767925.017 450.26 11/09/2013 11/09/2013 D Twin Bonanza OPBS101677 COST 0.489 MGA94_52 516591.165 7767917.516 450.564 11/09/2013 11/09/2013 D Twin Bonanza OPBS101678 COST 5.08 MGA94_52 516595.089 7767889.555 450.044 9/09/2013 9/09/2013 D Twin Bonanza OPBS101683 COST 4.41 MGA94_52 516600.23 7767879.122 449.95 9/09/2013 9/09/2013 D Twin Bonanza OPBS101688 LONGCALC 8.166 MGA94_52 516603.939 7767876.958 450.638 9/09/2013 9/09/2013 D Twin Bonanza OPBS101690 LONGCALC 3.326 MGA94_52 516600.374 7767885.388 449.573 9/09/2013 9/09/2013 D Twin Bonanza OPBS101692 LONGCALC 2.5 MGA94_52 516599.083 7767887.066 449.73 11/09/2013 11/09/2013 D Twin Bonanza OPBS101693 LONGCALC 2.5 MGA94_52 516599.896 7767886.124 449.792 11/09/2013 11/09/2013 D Twin Bonanza OPBS101694 LONGCALC 2.5 MGA94_52 516599.479 7767889.849 450.082 11/09/2013 11/09/2013 D Twin Bonanza OPBS101695 COST 4.32 MGA94_52 516603.389 7767839.136 450.638 13/09/2013 13/09/2013 D Twin Bonanza OPBS101702 COST 3.739 MGA94_52 516598.292 7767848.657 449.813 14/09/2013 14/09/2013 D Twin Bonanza OPBS101710 COST 4.501 MGA94_52 516593.898 7767858.084 449.564 14/09/2013 14/09/2013 D Twin Bonanza OPBS101716 COST 3.667 MGA94_52 516589.07 7767867.989 449.522 14/09/2013 14/09/2013 D Twin Bonanza OPBS101722 LONGCALC 37.051 MGA94_52 516590.753 7767870.84 449.239 14/09/2013 14/09/2013 D Twin Bonanza OPBS101733 LONGCALC 2.5 MGA94_52 516602.306 7767842.05 450.248 14/09/2013 14/09/2013 D Twin Bonanza OPBS101734 LONGCALC 2.5 MGA94_52 516603.523 7767840.304 450.24 14/09/2013 14/09/2013 D Twin Bonanza OPBS101735 LONGCALC 2.5 MGA94_52 516605.198 7767837.189 451.187 14/09/2013 14/09/2013 D Twin Bonanza OPBS101736 LONGCALC 2.5 MGA94_52 516601.483 7767840.717 450.168 14/09/2013 14/09/2013 D Twin Bonanza OPBS101737 LONGCALC 2.5 MGA94_52 516603.029 7767839.086 450.638 14/09/2013 14/09/2013 D Twin Bonanza OPBS101738 LONGCALC 26.137 MGA94_52 516510.426 7768115.067 449.058 15/09/2013 15/09/2013 D Twin Bonanza OPBS101751 LONGCALC 32.772 MGA94_52 516518.593 7768089.766 448.83 15/09/2013 15/09/2013 D Twin Bonanza OPBS101767 LONGCALC 4.147 MGA94_52 516526.597 7768073.704 449.294 15/09/2013 15/09/2013 D Twin Bonanza OPBS101770 LONGCALC 3.176 MGA94_52 516526.325 7768075.293 449.229 15/09/2013 15/09/2013 D Twin Bonanza OPBS101772 LONGCALC 2.5 MGA94_52 516613.831 7767956.383 450.385 15/09/2013 15/09/2013 D Twin Bonanza OPBS101773 COST 9.847 MGA94_52 516791.888 7766894.279 452.145 18/09/2013 18/09/2013 D Twin Bonanza OPBS101782 COST 10.09 MGA94_52 516787.446 7766902.279 452.727 19/09/2013 19/09/2013 D Twin Bonanza OPBS101793 COST 9.602 MGA94_52 516783.226 7766911.538 452.598 19/09/2013 19/09/2013 D Twin Bonanza OPBS101803 COST 9.266 MGA94_52 516778.79 7766920.431 451.368 19/09/2013 19/09/2013 D Twin Bonanza OPBS101813 COST 10.044 MGA94_52 516772.203 7766928.217 451.586 20/09/2013 20/09/2013 D Twin Bonanza OPBS101826 COST 11.097 MGA94_52 516767.177 7766936.821 451.619 20/09/2013 20/09/2013 D Twin Bonanza OPBS101838 COST 10.824 MGA94_52 516763.422 7766946.377 452.397 20/09/2013 20/09/2013 D Twin Bonanza OPBS101847 COST 10.03 MGA94_52 516759.309 7766955.146 451.753 20/09/2013 20/09/2013 D Twin Bonanza OPBS101858 COST 9.528 MGA94_52 516753.963 7766964.323 452.319 20/09/2013 20/09/2013 D Twin Bonanza OPBS101867 LONG 2.568 MGA94_52 516797.107 7766897.98 451.492 21/09/2013 21/09/2013 D Twin Bonanza OPBS101868 LONG 2.332 MGA94_52 516795.568 7766900.032 451.476 21/09/2013 21/09/2013 D Twin Bonanza OPBS101869 LONG 2.626 MGA94_52 516794.319 7766902.015 451.473 21/09/2013 21/09/2013 D Twin Bonanza OPBS101870 LONG 0.994 MGA94_52 516792.66 7766904.074 451.497 21/09/2013 21/09/2013 D Twin Bonanza OPBS101871 LONG 2.505 MGA94_52 516791.113 7766906.036 451.435 21/09/2013 21/09/2013 D Twin Bonanza OPBS101872 LONG 2.435 MGA94_52 516789.846 7766908.28 451.423 21/09/2013 21/09/2013 D Twin Bonanza OPBS101873 LONG 2.572 MGA94_52 516797.583 7766898.293 451.503 21/09/2013 21/09/2013 D Twin Bonanza OPBS101874 LONG 1.605 MGA94_52 516791.878 7766904.595 451.504 21/09/2013 21/09/2013 D Twin Bonanza OPBS101875 LONG 2.274 MGA94_52 516795.962 7766900.288 451.485 21/09/2013 21/09/2013 D Twin Bonanza OPBS101876 LONG 2.684 MGA94_52 516794.64 7766902.169 451.463 21/09/2013 21/09/2013 D Twin Bonanza OPBS101877 LONG 1.722 MGA94_52 516793.056 7766904.371 451.409 21/09/2013 21/09/2013 D Twin Bonanza OPBS101878 LONG 2.521 MGA94_52 516791.491 7766906.256 451.462 21/09/2013 21/09/2013 D Twin Bonanza OPBS101879 LONG 2.431 MGA94_52 516790.156 7766908.423 451.429 21/09/2013 21/09/2013 D Twin Bonanza OPBS101880 LONG 2.49 MGA94_52 516787.066 7766912.475 451.429 21/09/2013 21/09/2013 D Twin Bonanza OPBS101881 LONG 2.541 MGA94_52 516787.698 7766912.848 451.338 21/09/2013 21/09/2013 D Twin Bonanza OPBS101882 LONG 2.453 MGA94_52 516786.916 7766915.307 451.333 21/09/2013 21/09/2013 D Twin Bonanza OPBS101883 LONG 2.549 MGA94_52 516789.024 7766910.576 451.405 21/09/2013 21/09/2013 D Twin Bonanza OPBS101884 LONG 2.487 MGA94_52 516786.042 7766914.779 451.382 21/09/2013 21/09/2013 D Twin Bonanza OPBS101885 LONG 2.65 MGA94_52 516785.451 7766917.383 451.336 21/09/2013 21/09/2013 D Twin Bonanza OPBS101886 LONG 2.427 MGA94_52 516784.201 7766916.628 451.369 21/09/2013 21/09/2013 D Twin Bonanza OPBS101887 LONG 2.574 MGA94_52 516782.971 7766918.713 451.293 21/09/2013 21/09/2013 D Twin Bonanza OPBS101888 LONG 2.42 MGA94_52 516781.692 7766920.966 451.291 21/09/2013 21/09/2013 D Twin Bonanza OPBS101889 LONG 1.778 MGA94_52 516784.941 7766920.011 451.287 21/09/2013 21/09/2013 D Twin Bonanza OPBS101890 LONG 2.669 MGA94_52 516780.301 7766922.97 451.312 21/09/2013 21/09/2013 D Twin Bonanza OPBS101891 LONG 1.62 MGA94_52 516780.237 7766924.18 451.413 21/09/2013 21/09/2013 D Twin Bonanza OPBS101892 LONG 2.506 MGA94_52 516778.758 7766925.199 451.431 22/09/2013 22/09/2013 D Twin Bonanza OPBS101893 LONG 2.512 MGA94_52 516777.457 7766927.326 451.583 22/09/2013 22/09/2013 D Twin Bonanza OPBS101894 LONG 2.432 MGA94_52 516776.074 7766929.435 451.592 22/09/2013 22/09/2013 D Twin Bonanza OPBS101895 LONG 2.535 MGA94_52 516774.781 7766931.506 451.499 22/09/2013 22/09/2013 D Twin Bonanza OPBS101896 LONG 2.478 MGA94_52 516773.685 7766933.802 451.586 22/09/2013 22/09/2013 D Twin Bonanza OPBS101897 LONG 2.501 MGA94_52 516795.875 7766905.636 451.423 22/09/2013 22/09/2013 D Twin Bonanza OPBS101898 LONG 2.512 MGA94_52 516794.64 7766907.821 451.428 22/09/2013 22/09/2013 D Twin Bonanza OPBS101899 LONG 2.558 MGA94_52 516793.256 7766909.936 451.434 22/09/2013 22/09/2013 D Twin Bonanza OPBS101900 LONG 2.534 MGA94_52 516791.773 7766912.029 451.439 22/09/2013 22/09/2013 D Twin Bonanza OPBS101901 LONG 2.557 MGA94_52 516790.394 7766914.144 451.427 22/09/2013 22/09/2013 D Twin Bonanza OPBS101902 LONG 2.482 MGA94_52 516789.068 7766916.352 451.342 22/09/2013 22/09/2013 D Twin Bonanza OPBS101903 LONG 2.456 MGA94_52 516787.828 7766918.522 451.404 22/09/2013 22/09/2013 D Twin Bonanza OPBS101904 LONG 2.339 MGA94_52 516786.445 7766920.579 451.344 22/09/2013 22/09/2013 D Twin Bonanza OPBS101905 LONG 2.475 MGA94_52 516785.026 7766922.464 451.318 22/09/2013 22/09/2013 D Twin Bonanza OPBS101906 LONG 2.528 MGA94_52 516783.672 7766924.527 451.299 22/09/2013 22/09/2013 D Twin Bonanza OPBS101907 LONG 2.447 MGA94_52 516782.506 7766926.749 451.422 22/09/2013 22/09/2013 D Twin Bonanza OPBS101908 LONG 1.767 MGA94_52 516781.074 7766928.758 451.473 22/09/2013 22/09/2013 D Twin Bonanza OPBS101909 LONG 2.805 MGA94_52 516779.285 7766930.697 451.571 22/09/2013 22/09/2013 D Twin Bonanza OPBS101910 LONG 1.863 MGA94_52 516777.951 7766933.161 451.537 22/09/2013 22/09/2013 D Twin Bonanza OPBS101911 LONG 1.408 MGA94_52 516778.618 7766926.654 451.529 22/09/2013 22/09/2013 D Twin Bonanza OPBS101912 LONG 2.053 MGA94_52 516778.116 7766927.986 451.573 22/09/2013 22/09/2013 D Twin Bonanza OPBS101913 LONG 2.744 MGA94_52 516777.568 7766929.965 451.6 22/09/2013 22/09/2013 D Twin Bonanza OPBS101914 LONG 2.126 MGA94_52 516775.369 7766931.894 451.528 22/09/2013 22/09/2013 D Twin Bonanza OPBS101915 LONG 3.088 MGA94_52 516775.507 7766933.637 451.627 22/09/2013 22/09/2013 D Twin Bonanza OPBS101916 LONG 1.342 MGA94_52 516773.969 7766936.929 451.742 22/09/2013 22/09/2013 D Twin Bonanza OPBS101917 LONG 2.593 MGA94_52 516773.291 7766936.476 451.742 22/09/2013 22/09/2013 D Twin Bonanza OPBS101918 LONG 2.458 MGA94_52 516772.553 7766938.952 451.789 22/09/2013 22/09/2013 D Twin Bonanza OPBS101919 LONG 2.426 MGA94_52 516771.844 7766941.297 451.807 22/09/2013 22/09/2013 D Twin Bonanza OPBS101920 LONG 2.552 MGA94_52 516770.631 7766943.423 451.721 22/09/2013 22/09/2013 D Twin Bonanza OPBS101921 LONG 2.384 MGA94_52 516770.263 7766945.932 451.628 22/09/2013 22/09/2013 D Twin Bonanza OPBS101922 LONG 2.426 MGA94_52 516769.556 7766948.181 451.644 22/09/2013 22/09/2013 D Twin Bonanza OPBS101923 LONG 1.067 MGA94_52 516769.158 7766950.556 451.556 22/09/2013 22/09/2013 D Twin Bonanza OPBS101924 LONG 2.376 MGA94_52 516770.132 7766944.397 451.718 23/09/2013 23/09/2013 D Twin Bonanza OPBS101925 LONG 2.425 MGA94_52 516768.405 7766946.136 451.672 23/09/2013 23/09/2013 D Twin Bonanza OPBS101926 LONG 2.521 MGA94_52 516766.795 7766947.978 451.533 23/09/2013 23/09/2013 D Twin Bonanza OPBS101927 LONG 2.483 MGA94_52 516765.645 7766950.254 451.5 23/09/2013 23/09/2013 D Twin Bonanza OPBS101928 LONG 2.497 MGA94_52 516764.171 7766952.249 451.487 23/09/2013 23/09/2013 D Twin Bonanza OPBS101929 LONG 2.408 MGA94_52 516763.06 7766954.495 451.385 23/09/2013 23/09/2013 D Twin Bonanza OPBS101930 LONG 2.59 MGA94_52 516761.84 7766956.577 451.307 23/09/2013 23/09/2013 D Twin Bonanza OPBS101931 LONG 2.516 MGA94_52 516760.524 7766958.806 451.419 23/09/2013 23/09/2013 D Twin Bonanza OPBS101932 LONG 2.485 MGA94_52 516759.235 7766960.972 451.366 23/09/2013 23/09/2013 D Twin Bonanza OPBS101933 LONG 2.488 MGA94_52 516757.905 7766963.084 451.458 23/09/2013 23/09/2013 D Twin Bonanza OPBS101934 LONG 2.22 MGA94_52 516756.496 7766965.104 451.62 23/09/2013 23/09/2013 D Twin Bonanza OPBS101935 LONG 2.45 MGA94_52 516765.873 7766947.432 451.525 23/09/2013 23/09/2013 D Twin Bonanza OPBS101936 LONG 2.507 MGA94_52 516764.571 7766949.464 451.466 23/09/2013 23/09/2013 D Twin Bonanza OPBS101937 LONG 2.506 MGA94_52 516763.176 7766951.539 451.528 23/09/2013 23/09/2013 D Twin Bonanza OPBS101938 LONG 2.314 MGA94_52 516761.538 7766953.432 451.298 23/09/2013 23/09/2013 D Twin Bonanza OPBS101939 LONG 2.552 MGA94_52 516767.962 7766953.071 451.416 23/09/2013 23/09/2013 D Twin Bonanza OPBS101940 LONG 2.5 MGA94_52 516766.402 7766955.103 451.456 23/09/2013 23/09/2013 D Twin Bonanza OPBS101941 LONG 2.496 MGA94_52 516763.428 7766959.077 451.409 23/09/2013 23/09/2013 D Twin Bonanza OPBS101942 LONG 2.541 MGA94_52 516764.878 7766956.994 451.502 23/09/2013 23/09/2013 D Twin Bonanza OPBS101943 LONG 2.519 MGA94_52 516761.897 7766961.037 451.382 23/09/2013 23/09/2013 D Twin Bonanza OPBS101944 LONG 2.467 MGA94_52 516760.069 7766962.833 451.369 23/09/2013 23/09/2013 D Twin Bonanza OPBS101945 LONG 3.45 MGA94_52 516758.752 7766964.954 451.49 23/09/2013 23/09/2013 D Twin Bonanza OPBS101946 LONG 2.123 MGA94_52 516765.932 7766957.965 451.499 23/09/2013 23/09/2013 D Twin Bonanza OPBS101947 LONG 2.377 MGA94_52 516771.138 7766937.426 451.75 23/09/2013 23/09/2013 D Twin Bonanza OPBS101948 LONG 2.348 MGA94_52 516769.524 7766939.167 451.569 23/09/2013 23/09/2013 D Twin Bonanza OPBS101949 LONG 2.595 MGA94_52 516768.086 7766941.031 451.725 23/09/2013 23/09/2013 D Twin Bonanza OPBS101950 COST 7.421 MGA94_52 516715.612 7767744.439 450.581 24/09/2013 24/09/2013 D Twin Bonanza OPBS101957 COST 6.417 MGA94_52 516714.426 7767735.712 450.276 24/09/2013 24/09/2013 D Twin Bonanza OPBS101963 COST 6.234 MGA94_52 516712.966 7767726.776 450.266 24/09/2013 24/09/2013 D Twin Bonanza OPBS101969 COST 6.428 MGA94_52 516709.804 7767716.737 450.41 24/09/2013 24/09/2013 D Twin Bonanza OPBS101975 LONG 2.394 MGA94_52 516701.683 7767688.94 450.392 25/09/2013 25/09/2013 D Twin Bonanza OPBS101976 LONG 2.507 MGA94_52 516705.394 7767693.94 450.18 25/09/2013 25/09/2013 D Twin Bonanza OPBS101977 LONG 2.506 MGA94_52 516705.603 7767696.355 450.069 25/09/2013 25/09/2013 D Twin Bonanza OPBS101978 LONG 1.67 MGA94_52 516704.878 7767697.249 450.018 25/09/2013 25/09/2013 D Twin Bonanza OPBS101979 LONG 2.488 MGA94_52 516705.959 7767698.916 450.154 25/09/2013 25/09/2013 D Twin Bonanza OPBS101980 LONG 0.587 MGA94_52 516707.575 7767700.993 450.279 25/09/2013 25/09/2013 D Twin Bonanza OPBS101981 LONG 0.744 MGA94_52 516704.882 7767698.946 450.078 25/09/2013 25/09/2013 D Twin Bonanza OPBS101982 LONG 2.599 MGA94_52 516705.983 7767701.355 450.249 25/09/2013 25/09/2013 D Twin Bonanza OPBS101983 LONG 2.711 MGA94_52 516705.53 7767703.886 450.298 25/09/2013 25/09/2013 D Twin Bonanza OPBS101984 LONG 1.777 MGA94_52 516704.418 7767699.973 450.07 25/09/2013 25/09/2013 D Twin Bonanza OPBS101985 LONG 2.461 MGA94_52 516703.27 7767694.787 450.179 25/09/2013 25/09/2013 D Twin Bonanza OPBS101986 LONG 2.617 MGA94_52 516703.669 7767697.116 449.993 25/09/2013 25/09/2013 D Twin Bonanza OPBS101987 LONG 2.357 MGA94_52 516703.585 7767699.684 449.944 25/09/2013 25/09/2013 D Twin Bonanza OPBS101988 LONG 2.599 MGA94_52 516702.926 7767695.79 450.074 25/09/2013 25/09/2013 D Twin Bonanza OPBS101989 LONG 2.378 MGA94_52 516702.532 7767698.339 449.931 25/09/2013 25/09/2013 D Twin Bonanza OPBS101990 LONG 0.804 MGA94_52 516702.437 7767700.751 449.946 25/09/2013 25/09/2013 D Twin Bonanza OPBS101991 LONG 2.407 MGA94_52 516700.49 7767697.757 450.139 25/09/2013 25/09/2013 D Twin Bonanza OPBS101992 LONG 1.376 MGA94_52 516700.864 7767700.141 450.002 25/09/2013 25/09/2013 D Twin Bonanza OPBS101993 LONG 0.706 MGA94_52 516709.937 7767706.194 450.322 25/09/2013 25/09/2013 D Twin Bonanza OPBS101994 LONG 2.401 MGA94_52 516706.458 7767707.185 450.241 25/09/2013 25/09/2013 D Twin Bonanza OPBS101995 LONG 1.596 MGA94_52 516707.349 7767709.385 450.348 25/09/2013 25/09/2013 D Twin Bonanza OPBS101996 LONG 2.674 MGA94_52 516708.226 7767709.591 450.405 25/09/2013 25/09/2013 D Twin Bonanza OPBS101997 LONG 1.928 MGA94_52 516709.282 7767709.949 450.367 25/09/2013 25/09/2013 D Twin Bonanza OPBS101998 LONG 2.459 MGA94_52 516709.604 7767711.924 450.359 25/09/2013 25/09/2013 D Twin Bonanza OPBS101999 LONG 2.48 MGA94_52 516710.001 7767714.354 450.417 25/09/2013 25/09/2013 D Twin Bonanza OPBS102000 LONG 2.549 MGA94_52 516710.807 7767716.686 450.336 25/09/2013 25/09/2013 D Twin Bonanza OPBS102001 LONG 2.394 MGA94_52 516711.529 7767719.13 450.284 25/09/2013 25/09/2013 D Twin Bonanza OPBS102002 LONG 2.574 MGA94_52 516712.273 7767721.389 450.331 25/09/2013 25/09/2013 D Twin Bonanza OPBS102003 LONG 2.439 MGA94_52 516713.023 7767723.831 450.282 25/09/2013 25/09/2013 D Twin Bonanza OPBS102004 LONG 2.682 MGA94_52 516713.723 7767726.14 450.233 25/09/2013 25/09/2013 D Twin Bonanza OPBS102005 LONG 2.418 MGA94_52 516714.179 7767728.768 450.224 25/09/2013 25/09/2013 D Twin Bonanza OPBS102006 LONG 2.497 MGA94_52 516714.718 7767731.075 450.227 25/09/2013 25/09/2013 D Twin Bonanza OPBS102007 LONG 2.522 MGA94_52 516715.093 7767733.53 450.207 25/09/2013 25/09/2013 D Twin Bonanza OPBS102008 LONG 2.798 MGA94_52 516715.483 7767736.014 450.248 25/09/2013 25/09/2013 D Twin Bonanza OPBS102009 LONG 2.758 MGA94_52 516715.832 7767738.81 450.215 25/09/2013 25/09/2013 D Twin Bonanza OPBS102010 LONG 3.137 MGA94_52 516716.208 7767741.534 450.199 25/09/2013 25/09/2013 D Twin Bonanza OPBS102011 COST 7.133 MGA94_52 516701.655 7767708.276 450.223 25/09/2013 25/09/2013 D Twin Bonanza OPBS102016 COST 3.63 MGA94_52 516708.638 7767707.124 450.329 25/09/2013 25/09/2013 D Twin Bonanza OPBS102019 COST 6.52 MGA94_52 516699.927 7767698.663 450.088 25/09/2013 25/09/2013 D Twin Bonanza OPBS102026 COST 2.81 MGA94_52 516706.298 7767697.516 450.049 25/09/2013 25/09/2013 D Twin Bonanza OPBS102028 COST 8.157 MGA94_52 516697.318 7767690.143 450.546 26/09/2013 26/09/2013 D Twin Bonanza OPBS102036 COST 2.091 MGA94_52 516705.395 7767689.272 450.359 26/09/2013 26/09/2013 D Twin Bonanza OPBS102040 COST 6.55 MGA94_52 516529.804 7768056.013 449.698 27/09/2013 27/09/2013 D Twin Bonanza OPBS102049 COST 7.379 MGA94_52 516525.691 7768065.626 449.101 27/09/2013 27/09/2013 D Twin Bonanza OPBS102058 COST 7.317 MGA94_52 516521.821 7768075.074 449.023 27/09/2013 27/09/2013 D Twin Bonanza OPBS102067 COST 6.716 MGA94_52 516518.504 7768084.191 448.793 27/09/2013 27/09/2013 D Twin Bonanza OPBS102076 COST 6.207 MGA94_52 516514.925 7768093.707 448.684 28/09/2013 28/09/2013 D Twin Bonanza OPBS102085 COST 8.491 MGA94_52 516510.1 7768103.283 448.649 28/09/2013 28/09/2013 D Twin Bonanza OPBS102094 LONG 2.478 MGA94_52 516534.862 7768054.788 450.236 30/09/2013 30/09/2013 D Twin Bonanza OPBS102095 LONG 2.474 MGA94_52 516533.734 7768057.014 449.695 30/09/2013 30/09/2013 D Twin Bonanza OPBS102096 LONG 2.498 MGA94_52 516532.702 7768059.258 449.455 30/09/2013 30/09/2013 D Twin Bonanza OPBS102098 LONG 2.323 MGA94_52 516530.694 7768063.922 449.132 30/09/2013 30/09/2013 D Twin Bonanza OPBS102099 LONG 2.605 MGA94_52 516529.775 7768066.057 449.119 30/09/2013 30/09/2013 D Twin Bonanza OPBS102100 LONG 2.355 MGA94_52 516528.558 7768068.466 449.073 30/09/2013 30/09/2013 D Twin Bonanza OPBS102101 LONG 2.304 MGA94_52 516527.477 7768070.634 449.091 30/09/2013 30/09/2013 D Twin Bonanza OPBS102102 LONG 2.613 MGA94_52 516526.704 7768072.826 449.146 30/09/2013 30/09/2013 D Twin Bonanza OPBS102103 LONG 2.483 MGA94_52 516525.465 7768075.134 449.102 30/09/2013 30/09/2013 D Twin Bonanza OPBS102105 LONG 2.454 MGA94_52 516524.335 7768077.316 449.104 30/09/2013 30/09/2013 D Twin Bonanza OPBS102106 LONG 2.443 MGA94_52 516523.456 7768079.652 449.054 30/09/2013 30/09/2013 D Twin Bonanza OPBS102107 LONG 2.492 MGA94_52 516522.454 7768081.888 449.09 30/09/2013 30/09/2013 D Twin Bonanza OPBS102108 LONG 2.608 MGA94_52 516521.27 7768084.057 448.949 30/09/2013 30/09/2013 D Twin Bonanza OPBS102109 LONG 2.435 MGA94_52 516520.41 7768086.549 448.93 30/09/2013 30/09/2013 D Twin Bonanza OPBS102110 LONG 1.502 MGA94_52 516520.893 7768090.174 449.009 30/09/2013 30/09/2013 D Twin Bonanza OPBS102111 LONG 1.538 MGA94_52 516522.09 7768093.959 449.098 30/09/2013 30/09/2013 D Twin Bonanza OPBS102112 LONG 2.984 MGA94_52 516522.093 7768093.962 449.091 30/09/2013 30/09/2013 D Twin Bonanza OPBS102113 LONG 2.472 MGA94_52 516525.237 7768079.905 449.235 30/09/2013 30/09/2013 D Twin Bonanza OPBS102114 LONG 2.473 MGA94_52 516525.774 7768082.269 449.183 30/09/2013 30/09/2013 D Twin Bonanza OPBS102115 LONG 2.457 MGA94_52 516526.423 7768074.326 449.148 30/09/2013 30/09/2013 D Twin Bonanza OPBS102116 LONG 2.358 MGA94_52 516526.497 7768076.803 449.22 30/09/2013 30/09/2013 D Twin Bonanza OPBS102117 LONG 1.513 MGA94_52 516526.653 7768079.207 449.315 30/09/2013 30/09/2013 D Twin Bonanza OPBS102118 LONG 2.545 MGA94_52 516514.271 7768106.039 448.796 30/09/2013 30/09/2013 D Twin Bonanza OPBS102119 LONG 2.526 MGA94_52 516513.049 7768108.268 448.806 30/09/2013 30/09/2013 D Twin Bonanza OPBS102120 LONG 2.516 MGA94_52 516511.929 7768110.508 448.815 30/09/2013 30/09/2013 D Twin Bonanza OPBS102121 LONG 2.513 MGA94_52 516511.143 7768112.877 448.907 30/09/2013 30/09/2013 D Twin Bonanza OPBS102122 LONG 2.534 MGA94_52 516510.193 7768115.189 448.872 30/09/2013 30/09/2013 D Twin Bonanza OPBS102123 LONG 2.51 MGA94_52 516509.541 7768117.649 448.87 30/09/2013 30/09/2013 D Twin Bonanza OPBS102124 LONG 2.503 MGA94_52 516508.746 7768120.056 448.832 30/09/2013 30/09/2013 D Twin Bonanza OPBS102125 LONG 2.529 MGA94_52 516508.172 7768122.528 448.797 30/09/2013 30/09/2013 D Twin Bonanza OPBS102126 LONG 2.393 MGA94_52 516507.368 7768124.924 448.912 30/09/2013 30/09/2013 D Twin Bonanza OPBS102128 LONG 2.442 MGA94_52 516506.615 7768127.259 448.942 30/09/2013 30/09/2013 D Twin Bonanza OPBS102129 LONG 2.533 MGA94_52 516505.667 7768129.528 448.825 30/09/2013 30/09/2013 D Twin Bonanza OPBS102130 LONG 2.415 MGA94_52 516504.721 7768131.922 448.841 30/09/2013 30/09/2013 D Twin Bonanza OPBS102131 COST 7.11 MGA94_52 516507.919 7768112.535 448.889 1/10/2013 1/10/2013 D Twin Bonanza OPBS102139 COST 9.888 MGA94_52 516503.04 7768121.691 448.931 1/10/2013 1/10/2013 D Twin Bonanza OPBS102147 COST 7.099 MGA94_52 516497.836 7768140.902 448.707 1/10/2013 1/10/2013 D Twin Bonanza OPBS102153 COST 6.976 MGA94_52 516491.72 7768159.525 448.586 1/10/2013 1/10/2013 D Twin Bonanza OPBS102158 COST 3.507 MGA94_52 516485.437 7768178.106 448.572 1/10/2013 1/10/2013 D Twin Bonanza OPBS102164 COST 7.617 MGA94_52 516479.404 7768197.864 448.45 1/10/2013 1/10/2013 D Twin Bonanza OPBS102180 COST 7.474 MGA94_52 516468.267 7768236.33 448.352 2/10/2013 2/10/2013 D Twin Bonanza OPBS102186 COST 6.983 MGA94_52 516462.935 7768255.293 448.324 2/10/2013 2/10/2013 D Twin Bonanza OPBS102192 COST 7.725 MGA94_52 516455.254 7768274.333 448.237 2/10/2013 2/10/2013 D Twin Bonanza OPBS102198 COST 7.359 MGA94_52 516450.597 7768293.942 448.314 2/10/2013 2/10/2013 D Twin Bonanza OPBS102205 COST 6.464 MGA94_52 516447.783 7768313.878 448.232 3/10/2013 3/10/2013 D Twin Bonanza OPBS102209 COST 7.059 MGA94_52 516440.249 7768332.94 447.66 3/10/2013 3/10/2013 D Twin Bonanza OPBS102214 LONG 7.115 MGA94_52 516442.9 7768342.521 447.912 3/10/2013 3/10/2013 D Twin Bonanza OPBS102217 LONG 2.516 MGA94_52 516440.148 7768342.22 447.813 3/10/2013 3/10/2013 D Twin Bonanza OPBS102218 LONG 2.492 MGA94_52 516441.924 7768339.739 447.7 3/10/2013 3/10/2013 D Twin Bonanza OPBS102219 LONG 1.948 MGA94_52 516440.409 7768343.276 447.817 3/10/2013 3/10/2013 D Twin Bonanza OPBS102220 LONG 1.807 MGA94_52 516438.265 7768339.88 447.718 3/10/2013 3/10/2013 D Twin Bonanza OPBS102221 LONG 15.203 MGA94_52 516713.468 7767770.35 450.468 5/10/2013 5/10/2013 D Twin Bonanza OPBS102230 LONG 1.434 MGA94_52 516723.11 7767807.28 450.661 5/10/2013 5/10/2013 D Twin Bonanza OPBS102231 LONG 3.853 MGA94_52 516723.661 7767809.486 450.477 5/10/2013 5/10/2013 D Twin Bonanza OPBS102233 LONG 4.257 MGA94_52 516723.22 7767815.445 450.095 5/10/2013 5/10/2013 D Twin Bonanza OPBS102236 LONG 1.006 MGA94_52 516722.428 7767917.162 449.785 6/10/2013 6/10/2013 D Twin Bonanza OPBS102237 LONG 11.297 MGA94_52 516722.236 7767919.645 449.562 6/10/2013 6/10/2013 D Twin Bonanza OPBS102243 LONG 7.727 MGA94_52 516719.633 7767976.47 450.155 8/10/2013 8/10/2013 D Twin Bonanza OPBS102247 LONG 4.022 MGA94_52 516621.992 7767922.703 451.137 15/10/2013 15/10/2013 D Twin Bonanza OPBS102249 LONG 6.716 MGA94_52 516620.65 7767930.84 449.909 15/10/2013 15/10/2013 D Twin Bonanza OPBS102252 LONG 2.4 MGA94_52 516615.315 7767948.548 449.934 15/10/2013 15/10/2013 D Twin Bonanza OPBS102253 LONG 2.18 MGA94_52 516613.506 7767953.418 450.039 15/10/2013 15/10/2013 D Twin Bonanza OPBS102254 LONG 4.465 MGA94_52 516625.135 7767935.424 450.326 15/10/2013 15/10/2013 D Twin Bonanza OPBS102256 LONG 2.524 MGA94_52 516622.587 7767939.125 450.12 15/10/2013 15/10/2013 D Twin Bonanza OPBS102257 LONG 10.004 MGA94_52 516622.822 7767942.469 450.11 15/10/2013 15/10/2013 D Twin Bonanza OPBS102262 LONG 2.174 MGA94_52 516619.319 7767953.483 449.893 15/10/2013 15/10/2013 D Twin Bonanza OPBS102263 LONG 2.572 MGA94_52 516615.553 7767955.151 449.945 15/10/2013 15/10/2013 D Twin Bonanza OPBS102264 LONG 19.245 MGA94_52 516613.71 7767979.134 449.8 15/10/2013 15/10/2013 D Twin Bonanza OPBS102272 LONG 5.956 MGA94_52 516637.062 7768038.902 450.054 15/10/2013 15/10/2013 D Twin Bonanza OPBS102274 COST 4.171 MGA94_52 516713.81 7767726.849 448.761 25/10/2013 25/10/2013 D Twin Bonanza OPBS102278 COST 3.985 MGA94_52 516710.853 7767717.009 448.822 25/10/2013 25/10/2013 D Twin Bonanza OPBS102285 COST 2.379 MGA94_52 516708.283 7767707.595 448.6 25/10/2013 25/10/2013 D Twin Bonanza OPBS102289 COST 6.029 MGA94_52 516700.953 7767698.937 448.801 25/10/2013 25/10/2013 D Twin Bonanza OPBS102294 COST 0.886 MGA94_52 516706.858 7767697.789 448.754 25/10/2013 25/10/2013 D Twin Bonanza OPBS102296 COST 7.891 MGA94_52 516698.861 7767691.829 448.961 25/10/2013 25/10/2013 D Twin Bonanza OPBS102318 LONG 7.8 MGA94_52 516703.722 7767690.95 448.852 28/10/2013 28/10/2013 D Twin Bonanza OPBS102322 LONG 6.823 MGA94_52 516702.615 7767692.361 448.819 28/10/2013 28/10/2013 D Twin Bonanza OPBS102325 LONG 4.788 MGA94_52 516700.339 7767694.743 448.822 28/10/2013 28/10/2013 D Twin Bonanza t09201 COST 14.985 MGA94_52 516599.307 7767973.379 450.631 14/06/2013 26/06/2013 D Twin Bonanza t09222 COST 16.847 MGA94_52 516599.499 7767972.908 450.644 14/06/2013 26/06/2013 D Twin Bonanza T09245 COST 4.994 MGA94_52 516618.071 7767959.43 451.388 14/06/2013 26/06/2013 D Twin Bonanza T09251 COST 4.905 MGA94_52 516618.113 7767958.82 451.296 14/06/2013 26/06/2013 D Twin Bonanza t09259 COST 5.968 MGA94_52 516615.75 7767966.811 451.195 14/06/2013 26/06/2013 D Twin Bonanza t09266 COST 5.96 MGA94_52 516615.859 7767966.318 451.117 15/06/2013 26/06/2013 D Twin Bonanza t09276 COST 2.689 MGA94_52 516605.694 7767998.042 450.717 15/06/2013 26/06/2013 D Twin Bonanza t09282 COST 2.367 MGA94_52 516605.613 7767997.507 450.813 15/06/2013 26/06/2013 D Twin Bonanza t09289 COST 2.901 MGA94_52 516606.645 7768002.3 450.709 15/06/2013 26/06/2013 D Twin Bonanza t09293 COST 3.875 MGA94_52 516606.722 7768001.803 450.57 15/06/2013 26/06/2013 D Twin Bonanza t09301 COST 2.451 MGA94_52 516605.835 7768004.342 450.83 15/06/2013 26/06/2013 D Twin Bonanza t09305 COST 2.465 MGA94_52 516605.898 7768003.869 450.801 15/06/2013 26/06/2013 D Twin Bonanza T09310 COST 7.061 MGA94_52 516429.674 7768337.352 448.762 16/06/2013 26/06/2013 D Twin Bonanza T09321 COST 7.063 MGA94_52 516429.827 7768337.036 448.735 16/06/2013 26/06/2013 D Twin Bonanza t09330 COST 26.067 MGA94_52 516441.195 7768299.347 448.764 16/06/2013 26/06/2013 D Twin Bonanza T09359 COST 31.137 MGA94_52 516670.329 7768127.352 451.151 18/06/2013 26/06/2013 D Twin Bonanza T09395 COST 7.34 MGA94_52 516435.748 7768351.007 448.99 19/06/2013 26/06/2013 D Twin Bonanza T09408 COST 30.506 MGA94_52 516455.882 7768241.428 449.63 19/06/2013 26/06/2013 D Twin Bonanza T09441 COST 16.842 MGA94_52 516473.778 7768184.082 449.497 20/06/2013 26/06/2013 D Twin Bonanza T09462A COST 24.016 MGA94_52 516527.704 7768029.143 449.566 20/06/2013 20/06/2013 D Twin Bonanza T09486 COST 6.174 MGA94_52 516505.247 7768121.558 449.668 21/06/2013 20/06/2013 D Twin Bonanza T09501 COST 8.858 MGA94_52 516523.571 7768069.735 449.793 21/06/2013 20/06/2013 D Twin Bonanza T09514 COST 12.02 MGA94_52 516692.103 7767698.224 451.959 22/06/2013 29/06/2013 D Twin Bonanza T09531 COST 7.673 MGA94_52 516684.123 7767698.793 451.958 25/06/2013 29/06/2013 D Twin Bonanza T09544 COST 7.021 MGA94_52 516703.806 7767696.958 452.135 25/06/2013 29/06/2013 D Twin Bonanza T09554 COST 9.829 MGA94_52 516692.132 7767687.921 452.049 25/06/2013 29/06/2013 D Twin Bonanza T09568 COST 5.396 MGA94_52 516719.327 7767914.891 451.682 25/06/2013 25/06/2013 D Twin Bonanza T09577 COST 22.999 MGA94_52 516670.192 7767713.587 451.736 25/06/2013 29/06/2013 D Twin Bonanza T09607 COST 21.235 MGA94_52 516773.459 7767334.545 454.51 27/06/2013 29/06/2013 D Twin Bonanza T09633 COST 9.94 MGA94_52 516671.294 7767784.03 452.023 29/06/2013 29/06/2013 D Twin Bonanza T09645A COST 8.15 MGA94_52 516673.246 7767799.205 451.81 30/06/2013 30/06/2013 D Twin Bonanza T09653 COST 1.621 MGA94_52 516676.881 7767806.122 451.965 30/06/2013 30/06/2013 D Twin Bonanza T09655 COST 9.157 MGA94_52 516639.648 7767783.238 451.074 3/07/2013 3/07/2013 D Twin Bonanza T09668 COST 10.892 MGA94_52 518222.131 7766890.22 449.816 1/07/2013 1/07/2013 D Twin Bonanza T09680 COST 4.083 MGA94_52 518240.246 7766884.134 449.62 1/07/2013 1/07/2013 D Twin Bonanza T09685 COST 19.478 MGA94_52 518218.407 7766890.669 449.94 7/01/2013 7/01/2013 D Twin Bonanza T09698 COST 0.4 MGA94_52 516204 7767109 435 7/10/2013 7/10/2013 EOF