H0002 Version 4 H0003 Date_generated 22-Sep-19 H0004 Reporting_period_end_date 8-Feb-19 H0005 State NT H0100 Tenement_no EL30385 H0101 Tenement_holder Australian Ilmenite Resources H0102 Project_name ROPER HEAVY MINERALS PROJECT H0106 Tenement_operator Australian Ilmenite Resources H0150 250K_map_sheet_number SD5310 H0151 100K_map_sheet_number 5668 5768 5868 H0200 Start_date_of_data_acquisition 9-Feb-18 H0201 End_date_of_data_acquisition 8-Feb-19 H0202 Template_format SL4 H0203 Number_of_data_records 7 H0204 Date_of_metadata_update 22-Sep-19 H0300 Location_data_file H0301 Location_data_file H0302 Downhole_lithology_data_file H0303 Downhole_geochem_data_file H0304 Downhole_survey_data_file H0400 Drill_code HA H0401 Drill_contractor N/A H0402 Description Hand Auger H0500 Feature_located N/A H0501 Geodetic_datum GDA94 H0502 Vertical_datum AHD H0503 Projection UTM H0530 Coordinate_system Projected H0531 Projection_zone 53 H0532 Surveying_instrument GARMIN HAND HELD GPS H0533 Surveying_company Australian Ilmenite Resources H1000 Hole_id Easting_MGA Northing_MGA Elevation Total Hole Depth Azimuth_TRUE Azimuth_MAG Dip Drill Code Date_Started Date_Completed Tenement ID H1001 metres metres metres metres degrees degrees degrees N/A N/A N/A N/A H1004 D HA16159 392212.4755 8369236.187 66 0.7 0 0 90 HA 22/11/2016 22/11/2016 EL30385 D HA16160 392027.8841 8369593.005 61 1.03 0 0 90 HA 22/11/2016 22/11/2016 EL30385 D HA16161 392027.8841 8369593.005 63 0.8 0 0 90 HA 22/11/2016 22/11/2016 EL30385 D HA16162 390867.3227 8371932.928 56 1.02 0 0 90 HA 22/11/2016 22/11/2016 EL30385 D HA16166 396801.1724 8372349.704 55 1.02 0 0 90 HA 22/11/2016 22/11/2016 EL30385 D HA16167 393522.7237 8365847.757 54 1.02 0 0 90 HA 23/11/2016 23/11/2016 EL30385 D HA16168 393474.1804 8365871.552 52 0.3 0 0 90 HA 23/11/2016 23/11/2016 EL30385 EOF