H0002 Version 1 H0003 Date_generated 5-Sep-13 H0004 Reporting_period_end_date 9-Sep-13 H0005 State NT H0100 Tenement_no or Combined_rept_no GR 162 H0102 Project_name BARROW CREEK H0150 250K_map_sheet_number SF5301 SF5306 SF5305 SF5302 H0151 100K_map_sheet_number 5356 5456 5556 5855 5656 5455 5555 5655 5755 5754 5654 H0200 Start_date_of_data_acquisition 10-Sep-12 H0201 End_date_of_data_acquisition 9-Sep-13 H0202 Data_format SL3 H0203 Number_of_data_records 9 H0204 Date_of_metadata_update 8-Nov-12 H0301 Location_data_file GR_162_12_2013_GA_11_DrillCollars.txt H0302 Lithology_data_file GR_162_12_2013_GA_12_Lithology.txt H0303 DHAssay_data_file GR_162_12_2013_GA_13_DownholeGeochem.txt H0304 Survey_data_file GR_162_12_2013_GA_14_DownHoleSurveys.txt H0305 Samples_Data_File GR_162_12_2013_GA_13_DownholeGeochem.txt H0313 Alteration_data_file GR_162_12_2013_GA_15_DownHoleAlteration.txt H0314 Magsusc_data_file N/A H0315 Vein_data_file GR_162_12_2013_GA_16_DownHoleVein.txt H0318 Regolith NA H0322 Events_Data_File NA H0400 Drill_code RC H0401 Drill_contractor TOP-DRILL H0402 Drill code description Reverse Circulation H0500 Feature_type Drillhole Collar H0501 Geodetic_datum GDA94 H0502 Vertical_datum AHD H0503 Projection MGA H0508 Local_grid_name N/A H0530 Coordinate_system Projected H0531 Projection_zone 53 H0532 Surveying_instrument N/A H0533 Surveying_company N/A H1000 DataSet Hole_ID Hole_Type Max_Depth NAT_Grid_ID NAT_East NAT_North NAT_RL Nat_Survey_Method Nat_Survey_Date Nat_Survey_By Precollar_Depth BOCO_Depth TOFR_Depth BOO H2O_Depth Aquifer_Type Aquifer_Class Lease_ID Prospect Hole_Status Date_Started Date_Completed Responsible_Person Comments DEM_RL D Barrow Creek EMRC100001 RC 240 MGA94_53 376541 7668412 492.8 GPS 18/10/2012 AR 37 FR UCPH EL26825 EM COMPLETE 25/10/2012 26/10/2012 AR start calico X205001end calico X205240Lots o water throughout the hole. D Barrow Creek EMRC100002 RC 300 MGA94_53 376445 7668253 486.9 GPS 18/10/2012 AR 2 27 16 51 FR UCPH EL26825 EM COMPLETE 26/10/2012 27/10/2012 AR D Barrow Creek EMRC100003 RC 252 MGA94_53 376922 7668223 482.1 GPS 18/10/2012 KM 30 43 40 FR UCPH EL26825 EM COMPLETE 27/10/2012 28/10/2012 KM D Barrow Creek EMRC100004 RC 252 MGA94_53 376833 7668033 484.5 GPS 18/10/2012 AR FR UCPH EL26825 EM COMPLETE 28/10/2012 30/10/2012 AR D Barrow Creek EMRC100005 RC 66 MGA94_53 376202 7668656 484.5 GPS 18/10/2012 AR 3 22 13 FR UCPH EL26825 EM COMPLETE 30/10/2012 30/10/2012 AR hole ended due the amount lift fifteen degrees in 60m. START HOLE X206045END HOLE X206110 D Barrow Creek EMRC100005A RC 300 MGA94_53 376207 7668656 488.7 GPS 18/10/2012 AR 5 22 17 38 FR UCPH EL26825 EM COMPLETE 30/10/2012 1/11/2012 AR START CALICO X206611 D Barrow Creek EMRC100006 RC 224 MGA94_53 376028 7668347 486.9 GPS 18/10/2012 AR 3 37 28 43 FR UCPH EL26825 EM ABANDONED 18/10/2012 2/11/2012 AR D Barrow Creek EMRC100007 RC 252 MGA94_53 377387 7668185 485.9 GPS 18/10/2012 AR 34 60 55 46 FR UCPH EL26825 EM PLANNED 2/11/2012 9/11/2012 AR D Barrow Creek EMRC100008 RC 348 MGA94_53 377179 7667783 483.9 GPS 18/10/2012 AR 10 50 30 63 FR UCPH EL26825 EM COMPLETE 10/11/2012 11/11/2012 AR EOF