H0002 Version 4 H0003 Date_generated 11-Apr-13 H0004 Reporting_period_end_date 15-Mar-13 H0005 State NT H0100 Tenement_no/Combind_report_no H0101 Tenement_holder Crocodile Gold Australia H0102 Project_name Pine Creek Mining H0106 Tenement_operator Crocodile Gold Australian Operations H0150 250K_map_sheet_number SD5208 H0151 100K_map_sheet_number 5270 H0152 50K_map_sheet_number H0153 25K_map_sheet_number H0200 Start_date_of_data_acquisition 16-Mar-12 H0201 End_date_of_data_acquisition 15-Mar-13 H0202 Data_format DS4 H0203 Number_of_data_records 44 H0204 Date_of_metadata_update 11-Apr-13 H0300 Related_data_file H0301 Location_data_file PCM_NTSL4_COLL2013A.txt H0302 Lithology_data_file PCM_NTDL4_GEO2013A.txt H0303 Assay_data_file PCM_NTDG4_ASS2013A.txt H0304 Survey_data_file PCM_NTDS4_SURV2013A.txt H0305 SurfGeochem_Data_File H0307 Lithology_code_file H0308 File verification List PCM_Verification_List_2013.txt H0310 Water_data_file H0311 Water data incl in lithology file No H0313 Alteration_data_file H0314 Magsusc_data_file H0315 Vein_data_file H0316 Recovery_data_file H0317 Weathering_data_file H0318 DHQAQC_data_file H0319 SURFQAQC_data_file H0320 Other event_data_file H0400 Drill_code DD H0401 Drill_contractor May H0402 Description Diamond Drilling H0500 Feature_located Drillhole_collar H0501 Geodetic_datum GDA94 H0502 Vertical_datum AHD H0503 Projection Map Grid of Australia (MGA) H0508 Local Grid Name H0530 Coordinate_system Projected H0531 Projection_zone 52 H0532 Surface_Location_Survey_Instrument GPS H0533 Surface_Location_Survey_Company H0534 Downhole_Direction_Survey_Instrument Gyro Camera H0535 Downhole_Direction_Survey_Company Crocodile Gold May H0900 Remarks H1000 Hole_id Surveyed Depth Azimuth_MAG Dip Grid Azi Survey Instrument H1001 NA metres degrees degrees degrees NA H1004 0 2 2 2 2 0 D PCIDD_001 0.0 54.46 -49.7 99.03 GYRO D PCIDD_001 10.0 54.30 -49.9 98.87 GYRO D PCIDD_001 20.0 54.31 -50.2 98.88 GYRO D PCIDD_001 30.0 54.26 -50.5 98.83 GYRO D PCIDD_001 40.0 54.17 -50.5 98.74 GYRO D PCIDD_001 50.0 54.30 -50.6 98.87 GYRO D PCIDD_001 60.0 54.31 -50.6 98.88 GYRO D PCIDD_001 70.0 54.38 -50.7 98.95 GYRO D PCIDD_002 0.0 52.86 -75.4 97.43 GYRO D PCIDD_002 10.0 53.85 -75.5 98.42 GYRO D PCIDD_002 20.0 53.68 -75.7 98.25 GYRO D PCIDD_002 30.0 53.05 -75.8 97.62 GYRO D PCIDD_002 40.0 53.09 -75.6 97.66 GYRO D PCIDD_002 50.0 53.47 -75.7 98.04 GYRO D PCIDD_002 60.0 53.87 -75.7 98.44 GYRO D PCIDD_002 70.0 54.41 -75.7 98.98 GYRO D PCIDD_002 80.0 53.85 -75.7 98.42 GYRO D PCIDD_002 90.0 54.06 -75.8 98.63 GYRO D PCIDD_005 0.0 47.43 -55.5 95.46 GYRO D PCIDD_005 10.0 46.80 -55.3 94.83 GYRO D PCIDD_005 20.0 46.90 -55.0 94.94 GYRO D PCIDD_005 30.0 46.91 -54.8 94.94 GYRO D PCIDD_005 40.0 46.81 -54.7 94.84 GYRO D PCIDD_005 50.0 46.59 -54.6 94.63 GYRO D PCIDD_005 60.0 46.52 -54.5 94.55 GYRO D PCIDD_005 70.0 46.66 -54.2 94.69 GYRO D PCIDD_005 80.0 46.62 -54.1 94.65 GYRO D PCIDD_005 90.0 46.68 -53.9 94.71 GYRO D PCIDD_005 100.0 46.63 -53.7 94.66 GYRO D PCIDD_006 0.0 45.30 -70.0 90.00 Estimated D PCIDD_006 36.5 42.00 -68.8 89.87 Camera D PCIDD_006A 0.0 51.26 -69.9 95.83 GYRO D PCIDD_006A 10.0 51.28 -69.5 95.85 GYRO D PCIDD_006A 20.0 50.76 -69.8 95.33 GYRO D PCIDD_006A 30.0 51.10 -69.8 95.67 GYRO D PCIDD_006A 40.0 51.96 -69.6 96.53 GYRO D PCIDD_006A 50.0 52.56 -69.4 97.13 GYRO D PCIDD_006A 60.0 52.98 -69.1 97.55 GYRO D PCIDD_006A 70.0 53.37 -68.9 97.94 GYRO D PCIDD_006A 80.0 53.88 -69.0 98.45 GYRO D PCIDD_006A 90.0 54.19 -69.1 98.76 GYRO D PCIDD_006A 100.0 54.64 -69.1 99.21 GYRO D PCIDD_006A 110.0 54.91 -69.1 99.48 GYRO D PCIDD_006A 120.0 55.54 -69.1 100.11 GYRO