H0002 Version 4 H0003 Date_generated 6-Jul-15 H0004 Reporting_period_end_date 9-May-15 H0005 State NT H0100 Tenement_no/Combind_report_no EL 29599 H0101 Tenement_holder Rox Resources Limited H0102 Project_name Bonya H0106 Tenement_operator Rox Resources Limited H0150 250K_map_sheet_number SF5311 H0151 100K_map_sheet_number 6152 H0152 50K_map_sheet_number H0153 25K_map_sheet_number H0200 Start_date_of_data_acquisition 06-Nov-13 H0201 End_date_of_data_acquisition 05-Nov-14 H0202 Data_format SL4 H0203 Number_of_data_records 2 H0204 Date_of_metadata_update 6-Jul-15 H0300 Location_data_file EL29599_2014_A_02_COLL2014A.txt H0301 Location_data_file EL29599_2014_A_02_COLL2014A.txt H0302 Lithology_data_file EL29599_2014_A_03_GEO2014A_1.txt H0303 Assay_data_file EL29599_2014_A_04_ASS2014A.txt H0304 Survey_data_file EL29599_2014_A_05_SURV2014A.txt H0400 Drill_code RC H0401 Drill_contractor Top Drill H0402 Description Reverse Circulation H0500 Feature_located Drillhole_collar H0501 Geodetic_datum GDA94 H0502 Vertical_datum AHD H0503 Projection Map Grid of Australia (MGA) H0508 Local Grid Name H0530 Coordinate_system Projected H0531 Projection_zone 53 H0532 Surface_Location_Survey_Instrument GPS H0533 Surface_Location_Survey_Company H0900 Remarks H1000 Hole_id Easting_MGA Northing_MGA Elevation Total Hole Depth Drill Code PROJECT PROSPECT Zone SURVEY METHOD ACCURACY LEASE ID DATE Driller Company SUPERVISOR REMARKS H1001 NA metres metres metres metres NA NA NA NA NA metres NA NA NA NA NA NA H1004 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 D BYRC003 607531 7487304 449 114 RC Bonya BVTEM3 MGA94_53 GP 4 EL 29599 27/09/2014 Top Drill Rox G.Bennett Cased with 40mm pvc D BYRC004 607483 7487304 450 114 RC Bonya BVTEM3 MGA94_53 GP 4 EL 29599 28/09/2014 Top Drill Rox G.Bennett Cased with 40mm pvc DEOF