H0002 Version 3 H0003 Date_generated 20_Feb_2019 H0004 Reporting_period_end_date 1_Mar_2019 H0005 State NT H0100 Tenement_no EL29882 H0101 Tenement_holder Vista Gold Australia Pty Ltd. H0102 Project_name Mount Todd Project H0106 Tenement_operator Vista Gold Australia Pty Ltd. H0150 250K_map_sheet_number SD5309 SD5306 H0151 100K_map_sheet_number 5369 5370 H0152 Date_Drilling commenced 24_Oct_2018 H0153 Date_Drilling completed 15-Nov_2018 H0200 Start_date_of_data_acquisition 15-Nov_2018 H0201 End_date_of_data_acquisition 1_Mar_2019 H0202 Template_format SL1 H0203 Number_of_data_records 2 H0300 Related_data_filenames H0301 Report_Body EL29882_2019_C_01_Report.pdf H0302 Location_data_file This file H0303 Downhole_lithology_data_file EL29882_2019_C_03_Lithologs.txt H0304 Downhole_geochem_data_file EL29882_2019_C_04_DownholeGeochem.txt H0305 Downhole_survey_data_file EL29882_2019_C_05_DownholeSurveys.txt H0306 File_Verification_Listing EL29882_2019_C_06_FileListing.txt H0400 Drill_code DIA H0401 Drill_contractor DDH1 H0402 Description Diamond Bit - Coring H0500 Feature_located Hole_collar H0501 Geodetic_datum GDA94 H0502 Vertical_datum AHD H0503 Projection UTM MGA H0530 Coordinate_system Projected H0531 Projection_zone 53 H0532 Surveying_instrument Garmin Hand GPS H0533 Surveying_company Vista Gold Australia Pty Ltd H1000 Hole_ID xcoordinate ycoordinate zcoordinate Maxdepth Drill_contractor Surveying_company Date H1001 metres metres metres metres H1004 D WD018-001 190220 8456760 147 279.5 DDH1 Vista Gold 24/10/2018 D WD018-002 190275 8456640 147 291.4 DDH1 Vista Gold 4/11/2018 EOF