H0002 Version 3 H0003 Date_generated 05_May_2011 H0004 Reporting_period_end_date 14_May_2011 H0005 State NT H0100 Tenement_no EL25576 EL25669 EL25670 H0101 Tenement_holder Vista Gold Australia Pty Ltd. H0102 Project_name Mount Todd Project H0106 Tenement_operator Vista Gold Australia Pty Ltd. H0150 250K_map_sheet_number SD53-5 SD53-9 H0151 100K_map_sheet_number 5370 5369 H0200 Start_date_of_data_acquisition 03_June_2010 H0201 End_date_of_data_acquisition 08_Nov_2010 H0202 Template_format SL1 H0203 Number_of_data_records 4 H0400 Drill_code DIA H0401 Drill_contractor Grid Drilling Pty Ltd H0402 Description DIA Diamond Bit - Coring H0500 Feature_located Hole_collar H0501 Geodetic_datum GDA94 H0502 Vertical_datum AHD H0503 Projection UTM MGA H0530 Coordinate_system Projected H0531 Projection_zone 53 H0532 Surveying_instrument Garmin Oregon 300 Averaged Position H0533 Surveying_company Vista Gold Australia Pty Ltd H1000 Hole_ID xcoordinate ycoordinate zcoordinate Maxdepth Collar_azimuth Collar_inclination H1001 metres metres metres metres degrees degrees H1004 0.01 0.01 0.01 0.1 0.01 0.01 D GE10-001 200221.00 8455417.00 184 252 81.7 -55.1 D GE10-002 200356.00 8455416.00 178 197.4 88.5 -60 D GE10-003 200339.00 8455493.00 189 194.1 88.4 -58.6 D GE10-004 200190.00 8455495.00 177 194.9 87.6 -59