H0100 Tenement_no/Combined_Report_No EL22413 H0101 Tenement_holder Rio Tinto Exploration H0102 Tenement_operator Rio Tinto Exploration H0103 Project_name Baiguridji River H0104 250K_map_sheet_number 5307 H0105 100K_map_sheet_number 6071 H0200 Start_date_of_data_acquisition 5/08/2007 H0201 End_date_of_data_acquisition 5/08/2007 H0202 Template_Format SL1 H0203 Number_of_data_records 28 H0204 Date_of_metadata_update 9/06/2008 H0301 Location_data_file BaiguridjiRiver_2007_A_02_drillcollars.txt H0302 Downhole_Lithology_data_file BaiguridjiRiver_2007_A_03_lithology.txt H0303 Downhole_Geochem_data_file BaiguridjiRiver_2007_A_04_downholegeochem_XRF.txt H0400 Drill_code NQ aircore H0401 Drill_contractor Wallis Drilling H0500 Feature_located Drill Collar H0501 Geodetic_datum MGA94 H0502 Vertical_datum MGA94 H0503 Projection WGS84 H0504 Projection_zone 53S H0505 Surveying_instrument GPS H0506 Surveying_company Rio Tinto Exploration Pty Ltd H0507 Downhole_Survey No H1000 HOLEID SDATE FDATE MGA zone Easting Northing DIP TD PROSPECT DRILL_CON GEOLOGIST H1001 metres metres degrees metres D AC07CR001 5/08/2007 5/08/2007 53 "594,069" "8,557,582" -90 3.5 Cato River Wallis Drilling "GKH, MJP" D AC07CR002 5/08/2007 5/08/2007 53 "594,049" "8,558,024" -90 3.5 Cato River Wallis Drilling "GKH, MJP" D AC07CR003 5/08/2007 5/08/2007 53 "594,067" "8,558,295" -90 3.75 Cato River Wallis Drilling "GKH, MJP" D AC07CR004 5/08/2007 5/08/2007 53 "594,067" "8,558,575" -90 6 Cato River Wallis Drilling "GKH, MJP" D AC07CR005 5/08/2007 5/08/2007 53 "594,042" "594,042" -90 9 Cato River Wallis Drilling "GKH, MJP" EOF