Please note that there had been no separate processing reports provided. Processing workflow is integrated into the SEGY headers and also copied here. Applies to PSTM processing of 2D lines acquired by Geokinetics (2011) and Terrex (2012): C11 **** PROCESSING SEQUENCE **** C12 TRANSCRIPTION FROM SEGD TO FUGRO INTERNAL FORMAT. C13 TRACE EDIT AND GEOMETRY HEADER UPDATE C14 AMPLITUDE RECOVERY : SPHERICAL DIVERGENCE CORRECTION C15 ZERO TO MINIMUM PHASE CONVERSION C16 TIME FREQUENCY DENOISE AND SURFACE WAVE NOISE ATTENUATION C17 STATICS : FLOATING DATUM CORRECTION. REFRACTION STATICS C18 INT DATUM OF 325M AND BACK TO 0M USING VR 4500M/SEC C19 CDP SORT + SURFACE CONSISTENT 24MS GAP DECONVOLUTION C20 1ST PASS VELOCITY ANALYSIS + 1ST PASS RESIDUAL STATICS C21 2ND PASS VELOCITY ANALYSIS + 2ND PASS RESIDUAL STATICS C22 SCAMP C23 CADZOW FILTER + COMMON OFFSET RANNA + BALANS + NMO LINEAR RADON C24 PSTM 1 + 3RD PASS VELOCITY ANALYSIS C25 PSTM 2 C26 NMO + ANGLE MUTE 7 TO 45 DEGREES + PRE-STACK AGC SCALING C27 FLOATING DATUM CORRECTION : NEW TIME ORIGIN OF -300MS C28 STACK --- Applies to PSTM processing of 2D seismic lines acquired by WesternGeco (2012): C25 PROCESSING: CORRELATION, GEOMETRY UPDATE & QC; MINIMUM PHASE FILTER; C26 ANOMALOUS AMPLITUDE ATTENUATION & LINEAR NOISE ATTENUATION; RSCD: 24MS, C27 OPER 240; SORT TO CMP; SJI STATIC CORRECTION; MISER; MBWP; MIG PREP C28 KIRCH PRE-STACK TIME MIG (30 DEG); INV MO; MO (POST MIG VELS); T-X MUTE C29 RMS GAIN; STACK; DATUM CORRECTION; RNA; DATUM TO MSL; SEGY --- Applies to PSDM processing: C22 PROCESSING S EQUENCE: C23 INITIAL VELOCITY ESTIMATION ALONG 2D LINE C24 PSDM C25 VELOCITY UPDATE ITERATIONS C26 B UILD PSEUDO 3D SURVEY C27 BUILD INITIAL 3D VOLUME C28 PSDM C29 3D VELOCITY UPDATE C30 PSDM C31 1D CORRECTION C32 POST STACK PROCESSING