H0002 Version 4 H0003 Date_generated 28-Jan-14 H0004 Reporting_period_end_date 29-Nov-13 H0005 State NT H0100 Tenement_no/Combind_report_no EL 28045 H0101 Tenement_holder Davenport Resources Pty Ltd H0102 Project_name Southern Cross Bore H0106 Tenement_operator Arunta Resources Ltd H0150 250K_map_sheet_number SF5314 H0151 100K_map_sheet_number 5751 H0152 50K_map_sheet_number H0153 25K_map_sheet_number H0200 Start_date_of_data_acquisition 30-Nov-12 H0201 End_date_of_data_acquisition 29-Nov-13 H0202 Data_format DL4 H0203 Number_of_data_records 35 H0204 Date_of_metadata_update 28-Jan-14 H0300 Recovery_data_file SCB_NTDL4_CORE2013A.txt H0301 Location_data_file SCB_NTSL4_COLL2013A.txt H0302 Lithology_data_file SCB_NTDL4_GEO2013A.txt H0303 Assay_data_file SCB_NTDG4_ASS2013A.txt H0304 Survey_data_file SCB_NTDS4_SURV2013A.txt H0305 SurfGeochem_Data_File SCB_NTSG4_SOIL2013A.txt SCB_NTSG4_ROCK2013A.txt H0307 Lithology_code_file SCBP_2013_Abbreviations H0308 File verification List SCB_Verification_List_2013.txt H0310 Water_data_file H0311 Water data incl in lithology file Yes H0313 Alteration_data_file H0314 Magsusc_data_file H0315 Vein_data_file H0316 Recovery_data_file SCB_NTDL4_CORE2013A.txt H0317 Weathering_data_file H0318 DHQAQC_data_file H0319 SURFQAQC_data_file H0320 Other event_data_file SCB_NTDL4_RQD2013A.txt SCB_NTDL4_STRU2013A.txt H0400 Drill_code RCD H0401 Drill_contractor Australian Mineral and Waterwell Drilling H0402 Description RC precollar with diamond tail H0500 Feature_located Drillhole_collar H0501 Geodetic_datum GDA94 H0502 Vertical_datum Nominal H0503 Projection Map Grid of Australia (MGA) H0508 Local Grid Name H0530 Coordinate_system Projected H0531 Projection_zone 53 H0532 Surface_Location_Survey_Instrument Both GPS and dGPS used as indicated in column Surv H0533 Surface_Location_Survey_Company Arunta Resources Limited H0536 Downhole_Geophysical_Survey_Instrument H0537 Downhole_Geophysical_Survey_Company H0900 Remarks H1000 Hole_id Depth From Depth To Block_Interval (m) Recovered_Interval (m) Recovery Comment H1001 NA metres metres metres metres % NA H1004 0 0 0 0 0 0 0 D 13BARCD038 102.7 105.3 2.6 2.56 98.5 D 13BARCD038 105.3 108.3 3 2.98 99.3 D 13BARCD038 108.3 111.3 3 2.9 96.7 D 13BARCD038 111.3 114.3 3 1.81 60.3 D 13BARCD038 114.3 117.3 3 2.92 97.3 D 13BARCD038 117.3 120.3 3 2.9 96.7 D 13BARCD038 120.3 123.3 3 2.9 96.7 D 13BARCD038 123.3 126.3 3 2.86 95.3 D 13BARCD038 126.3 128.8 2.5 2.41 96.4 D 13BARCD038 128.8 131.9 3.1 2.8 90.3 D 13BARCD038 131.9 134.7 2.8 2.8 100 D 13BARCD038 134.7 135.3 0.6 0.66 110 D 13BARCD038 135.3 138.3 3 3 100 D 13BARCD038 138.3 141.3 3 3 100 D 13BARCD038 141.3 144.3 3 2.91 97 D 13BARCD038 144.3 145.2 0.9 0.9 100 D 13BARCD038 145.2 147.3 2.1 2.17 103.3 D 13BARCD038 147.3 148.6 1.3 1.16 89.2 D 13BARCD038 148.6 150.3 1.7 1.77 104.1 D 13BARCD038 150.3 153.3 3 2.98 99.3 D 13BARCD038 153.3 156 2.7 2.67 98.9 D 13BARCD038 156 159.1 3.1 2.5 80.6 D 13BARCD038 159.1 162.2 3.1 0.77 24.8 D 13BARCD038 162.2 163 0.8 0.6 75 D 13BARCD038 163 163.6 0.6 0.45 75 D 13BARCD038 163.6 164.4 0.8 0 0 0.11m of interpreted "cavings" entire interval D 13BARCD038 164.4 165.2 0.8 0.48 60 0.11m of interpreted "cavings" at start of interval D 13BARCD038 165.2 165.6 0.4 0.5 125 D 13BARCD038 165.6 166 0.4 0.17 42.5 D 13BARCD038 166 166.3 0.3 0.23 76.7 0.6m of interpreted "cavings" at start of interval D 13BARCD038 166.3 166.6 0.3 0.13 43.3 1.5m of interpreted "cavings" at start of interval D 13BARCD038 166.6 166.9 0.3 0.26 86.7 0.22m of interpreted "cavings" at end of interval D 13BARCD038 166.9 167.9 1 0.3 30 1.25m of interpreted "cavings" at start of interval D 13BARCD038 167.9 168 0.1 0.1 100