H0002 Version 3 H0003 Date_Generated 19-Aug-11 H0004 Reporting_period_end_date 20-Jul-11 H0005 State NT H0100 Tenement_name EL26589 H0101 Tenement_holder Minemakers Australia Pty Ltd H0102 Project_name Wonarah South H0150 Map_sheet_number 250K SE53-11 H0200 Start_date_of_data_acquisition 27/05/2008 H0201 End_date_of_data_acquisition 20/07/2011 H0202 Template_format SL3 H0203 Number_of_data_records 3 H0204 Date_of_metadata_update 19/08/2011 H0301 Downhole_lithology_data_file EL26589_2011_R_03_Lithology.txt H0400 Drilling_code RC H0401 Drill_Contractor Tom Browne Drilling Services Pty Ltd H0402 Description Water bore drilling H0500 Surveyed_feature Hole_collar H0501 Geodetic_datum GDA94 H0502 Vertical_datum AHD H0503 Projection UTM MGA H0530 Coordinate system Projected H0531 Projection_zone 53 H1000 mFrom mTo Hydro Notes flow ec temp pH s/20L WNWE013 78 78.1 78m:Wet on rod change WNWE013 96 96.1 "96m:First continuous water,Q?0.2 L/s" WNWE013 99 106 "99-102m:Very problematic drilling, can not clear hole.Q?2 L/s. Water has a high proportion of suspended clay" WNWE013 114 114.1 "114m:Q=2L/s, EC=1.4mS/cm @ 38C, pH=8.5" 2 1.4 38 8.5 WNWE013 132 132.1 "132m:Q=1.8L/s, EC=1.4mS/cm @ 38C, pH=8.5" 1.8 1.4 38 8.5 WNWE013 150 150.1 "150m:Q=1.3L/s, EC=1.5mS/cm @ 38C, pH=8.5 Water has a high proportion of suspended clay. Will be difficult to establish a bore in this aquifer. Dust from cyclone while drilling" 1.3 1.5 38 8.5 WNWE014 84 84.1 84m:Wet on rod change WNWE014 102 102.1 "102m:First continuous water,Q?0.5 L/s" WNWE014 108 108.1 "108m:Q=1L/s, EC=1.4mS/cm @ 38C, pH=8.7" 1 1.4 38 8.7 WNWE014 150 150.1 "150m:Q=1L/s, EC=1.4mS/cm @ 38C, pH=8.7" 1 1.4 38 8.7 WNWE015 84 84.1 84m:Wet on rod change WNWE015 90 90.1 "90m:First continuous water,Q?0.5 L/s" WNWE015 102 102.1 "102m:First continuous water,Q?1 L/s, EC=1.4mS/cm @ 36, pH=8.7 " WNWE015 120 120.1 "120m: Q?1 L/s, dust from cyclone while drilling" WNWE015 149 149.1 149m: Minor fracture WNWE015 156 156.1 "156m:Q=1L/s, EC=1.4mS/cm @ 36C, pH=8.7" 1 1.4 36 8.7