ID - 57b67f45-92e7-4bc2-a463-14b26fe39ae4 TY - RPRT T1 - Annual Report for Wandie Project ML 29909 for period 4 June 2017 to 3 June 2018 A1 - Hardie, C, A1 - Mineral Contracting Australia PY - 2018/// Y1 - 2018/ AB - Mineral Contracting Australia Pty Ltd (MCA) acquired ML 29909 during the reporting period. An Instrument of Dealing - Transfer was registered on 6 March 2018. MCA plans to process low grade mineralised stockpiles and re-process tailings from previous alluvial processing operations on the Wandie Project (ML 29909) and Saunders Rush Project (ML 29915). A Mine Management Plan (MMP) was approved on 5 July 2018. During the reporting period numerous site visits have been conducted on ML 29909 and ML 29915 with geologists, metallurgists, environmentalists and various other contractors to assist in compiling the required data for the MMP and for planning purposes for the processing plant and activities. T2 - CR2018-0265 UR - https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/93933 ER -