ID  - c71922ea-193c-4472-8777-5b02d9b27208
TY  - RPRT
T1  - Seismic Data Processing Report for Central Petroleum limited
A1  - Central Petroleum
A2  - Furgo Seismic Imaging
PY  - 2008///
Y1  - 2008/
AB  - The 2008 central Petroleum Camel Flats 2D reprocessing Seismic Survey in the Amadeus Basin was processed by Furgro Seismic Imaging between July and August 2008. The survey was approximately 322km long and consisted of 14 lines.
T2  - PR2008-G179
UR  - https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/92917
M3  - Seismic Processing
ER  -

