ID  - 1a2193df-a943-4eaa-b15d-7221521ae5a0
TY  - RPRT
T1  - Time Reprocessing Report for Origin
A1  - Falcon Oil & Gas Australia
A1  - Origin Energy
A2  - TBI
PY  - 2020///
Y1  - 2020/
AB  - Thrust Belt Imaging (TBI) carried out seismic reprocessing of 17 2D lines in the Beetaloo Sub-basin for Origin, in order to improve structural continuity and to increase fault resolution. The reprocessing project was carried out during the months of September 2019 - January 2020.
T2  - PR2021-G006
UR  - https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/92619
M3  - Seismic Processing
ER  -

