ID  - 595abe21-5c11-41ad-8ba3-1fa7f37ca7d1
TY  - RPRT
T1  - Seismic Survey Acquisition Report and Processing Report
A1  - Santos
A2  - Santos
A2  - Velseis Processing
PY  - 2020///
Y1  - 2020/
AB  - MCSAN19 McArthur Basin 2D seismic survey was conducted by Santos in EP161. This survey comprises only a single ~10 Km 2D seismic line. The purpose of this seismic line was to minimise the geologic risk of the horizontal well by identifying any potential significant hazards, such as faults that may be intersected.
T2  - PR2020-G002
UR  - https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/92281
M3  - Seismic Acquisition
M3  - Seismic Processing
ER  -

