ID  - 595763fe-1637-4e90-950b-89ac7d99ba5c
TY  - RPRT
T1  - Final Technical Report EL 32082 from 23 August 2019 to 6 August 2020
A1  - Centrex QLD Exploration
A1  - Centrex Metals Limited
PY  - 2020///
Y1  - 2020/
AB  - This is the first and final Annual Technical Report for EL 32082. Centrex QLD Exploration Pty Ltd ('Centrex') is exploring for Sedimentary pelletal phosphorite within the prospective Wiso Basin. EL 32082 was granted on the 26th August, 2019 for a period of 6 years. EL 32082 was surrended on the 6th August, 2020. Upon re-examination of geological data on this tenement Centrex Metal Limited has downgraded the mineral potential of the area and has come to the conculsion that it is no longer viable.
T2  - CR2020-0350
UR  - https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/90895
ER  -

