ID - 53d2381a-bed2-4906-b798-69cccb166608 TY - RPRT T1 - MCN 1366 and MCN 1369 Emerald Hill Annual Technical Report for the period 1 January 2011 to 31 December 2011 A1 - Corporate Developments A1 - Outback Metals PY - 2011/// Y1 - 2011/ AB - Current exploration in the area is concentrating on tin and rare earths. During the current reporting period several site and reconnaissance visits were carried out and some samples were collected. The company acquired the services of Mr C J Robinson and commissioned a report on the Emerald Hill Mineral Claims. In his report, Mr Robinson noted that Emerald Hill is regarded as a prospect that, with little work, could be mined and the ore trucked to Mount Wells for treatment. The cassiterite/kaolin/quartz lode occupies a shear within soft greywackes, with dimensions of 22m x 2m visible at surface and in workings. The prospect is tentatively regarded as a pipe, though only one control is seen - the footwall shear in the slot and tunnel. Grades range from 2% Sn to 47% Sn. T2 - CR2011-1174 UR - https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/88816 ER -