ID  - 03d3e051-9582-409e-8b32-729207a86745
TY  - RPRT
T1  - Tanami Project EL 26625 Annual technical report for the period 24 May 2012 to 23 May 2013
A1  - Parker, F,
A1  - ERO Mining
PY  - 2013///
Y1  - 2013/
AB  - During ERO's second year of tenure the only exploration work conducted on the tenement was data compilation. The planned airborne EM and magnetic survey was not able to be carried out due to the inability to find a suitable geophysical contractor. Efforts are continuing. No ground based fieldwork has been able to be conducted as we have yet to have heritage surveys carried out and we are therefore unable to set foot on the ground. Heritage surveys cannot be conducted until target areas have been selected by the airborne geophysical surveys.
T2  - CR2013-0529
UR  - https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/88271
ER  -