ID - 8f3f7cd7-176c-4023-81f6-1451ff22a2eb TY - RPRT T1 - Wellington Range Project EL 5893 Annual Report 4 May 2005 to 3 May 2006 A1 - Beckitt, G, A1 - Carter, M, A1 - Cameco Australia PY - 2006/// Y1 - 2006/ AB - The report describes work undertaken on EL 5893 for year ending 3 may 2006. Work was largely geophysics-related, and includes an airborne EM survey and interpretation of these data by Cameco staff. An external consultant, southern Geoscience Limited, undertook an interpretation of airborne magnetic data collected in 2005. Additional work included a single day of helicopter reconnaissance, mainly over the northern section of the tenement. A single outcrop was collected. No significant results were obtained during the reporting field season, although the aeromagnetic interpretation was used as foundation to plan a substantial drilling program for the2006 field season. T2 - CR2006-0153 UR - https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/85450 ER -