ID - 7b9ed45d-eeda-48a0-b349-e8147aed0e77 TY - RPRT T1 - Partial Relinquishment Report EL 28904 27 March 2012 to 26 March 2016 A1 - Edgar, H, A1 - Manto Mining PY - 2016/// Y1 - 2016/ AB - During 2012 to 2014, nil exploration work was undertaken on the relinquished blocks. During 2014 to 2015, Manto conducted aeromagnetic and radiometric surveys over the licence area. During 2015 to 2016, work comprised of field reconnaissance and interpretation of the aeromagnetic and airborne gamma surveys.In June and July 2016, Manto conducted a field reconnaissance trip to the licence to check the surface mineralisation and geology of the blocks to be relinquished. Nil mineralisation at the surface on both the eastern and western portions of the licence, confirmed that these blocks were able to be dropped from the licence. T2 - CR2016-0375 UR - https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/83932 ER -