ID  - bc22931a-b516-4faf-9eb8-d556b5cfcb1f
TY  - RPRT
T1  - Annual report for EL 29738 and EL 29290 GR340 for reporting period 27 May 2013 to 9 September 2014
A1  - Dai, X,
A1  - China Australia Land Resources
PY  - 2014///
Y1  - 2014/
AB  - During the reporting period, about 10kms of route geological  survey was completed and 32 soil geochemical samples analysed using a portable Niton XRF analyser. There is potential for Pb-Zn and other base metals.
T2  - CR2014-0815
UR  - https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/81040
ER  -

