ID - be90dea9-c1ca-446f-bd0b-6d2a99acea48 TY - RPRT T1 - Summary of drilling at North Enterprise MLN 13 February to June 1992 A1 - Fawcett, C, A1 - Pine Creek Goldfields PY - 1992/// Y1 - 1992/ AB - Eleven inclined and vertical RC holes were drilled to the north of the Enterprise pit for a total of 680m. These holes were designed to test the area between the Enterprise Anticline and the Czarina Anticline across the Eastern Fault Zone and the Enterprise syncline. Mineralisation across the syncline and in particular between the syncline and czarina Anticline was of low grade but continuous and well structured, indicating some potential for oxide material in the area. T2 - CR1992-0826 UR - https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/78721 ER -