ID - ce1b2b87-fed6-4af7-bbda-7d344a2331d1 TY - RPRT T1 - Final surrender report EL 5304 Juno, Tennant Creek A1 - England, C, A1 - Asarco Gold PY - 1993/// Y1 - 1993/ AB - Work completed during the period of tenure included lag geochemistry, auger soil sampling, 6.6 line kms of ground magnetics and vacuum drilling. Weakly anomalous values were obtained. The low level surface anomalies were often regarded as spurious due to wind blown contamination from nearby sites. T2 - CR1993-0532 UR - https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/68755 ER -