ID - 4087cd8b-83bc-442c-a218-a1d849d9d3a9 TY - RPRT T1 - Annual report for period 6 April 1998 to 5 April 1999, ERL 128, Huandot Magnesite deposit. A1 - Barnes, L, A1 - Normandy Industrial Minerals PY - 1999/// Y1 - 1999/ AB - 1/6/99 Further rehabilitation was conducted on the licence. Continuing discussions with Norsk Hydro re specifications resulted in new specifications being stipulated ie. 44% MgO content and acid insolubles to 3.7%. Analysis and investigations regarding soluble iron within the magnesite occur as substiuted ions within the magnesite crystal lattice. However the iron is readily soluble in hot HCL. A further resource estimate was conducted with the new specifications ie. for 44.1% MgO a total resource of 3,740 000 tonnes is estimated. At a production of 150 000 tonnes per annum a cost of $53/tonne is indicated and is considered too high by Norsk. T2 - CR1999-0213 UR - https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/66103 ER -