ID  - 564f4317-3570-4712-8cd6-ce935c07f542
TY  - RPRT
T1  - SEL8035 Mt Drummond second annual report for period of tenure 01-04-1994 to 31-03-1995
A1  - CRA Exploration
PY  - 1995///
Y1  - 1995/
AB  - Previous sampling had defined 2 cohesive load in soil anomalies referred to as Top Rocky and Rock Hole. Follow up at Top Rocky consisted of 5 RC holes (378m). A best results of 2m at 1.6%Pb was obtained. All mineralised interests occurred in the oxidised zone. At Rock Hole follow consisted of 5 RAB holes (344m) returning peak values of 22ppm Pb and 202ppm Zn. 2 RC hole (198m) were drilled to test the interpreted location of an EM anomaly. No significant intercepts were made.
T2  - CR1995-0316
UR  - https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/63113
ER  -

