Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/91597
Export to Endnote
Title: Mount Hardy Project First Group Annual Report for the period ending 16 September 2015
Title Holder / Company: TNG
Enigma Mining
Report id: CR2015-0687
Tenure: EL27892;  EL28694;  EL29219
Year: 2015
Author: Wetherley, C
Grey, K
Abstract: The Mount Hardy project is located approximately 300km north-west of Alice Springs in Northern Territory. The project comprises three exploration licences (EL 27892, EL 28694 and EL 29219; Figure 1) which lie in the Aileron Province of the northern Arunta region. The project area contains the historical Mount Hardy Copper Field where known copper mineralisation exists within the highly prospective Lander Group. The project area is accessed via the Tanami Road and is situated on the Mount Doreen pastoral lease (NT Portion 1947 under Perpetual Pastoral Lease 1035). Amalgamated reporting was granted on 12 October 2015 with the reporting period for the group 17 September to 16 September and a report submission date of 16 November. Limited exploration was undertaken during the reporting year. Rehabilitation of previous drillholes is ongoing along with the continued assessment of the project area as a whole.
Date Added: 3-Jun-2021
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
GR372_2015_A_01.pdf3.99 MBPDF Add
GR372_2015_A_02_Appendix1_FieldInspectionReport.pdf3.06 MBPDF Add
GR372_2015_A_03_Verification_List.txt412 BText Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader