Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/87543
Export to Endnote
Title: Westminster Project Second annual report for the period 1 February 2008 to 31 January 2009 MLC 511
Title Holder / Company: Truscott Mining
Report id: CR2009-0072
Tenure: MLC511
Year: 2009
Author: Henderson, I
Abstract: Exploration carried out on the tenements in the year ended 31 January 2009 included: 1:2000 Geological mapping; rock chip sampling; phase 1 structural diamond core drilling (3 holes for 909.5 m); and phase 2 definition RC and diamond core drilling (3 Diamond holes for 719.6 m and 2 RC holes for 212m). The work has confirmed the potential for MLC 511 to host significant gold and base metal ore grade mineralization. Phase 1 drilling identified an east west trending structural corridor defined by shearing and alteration. The structural corridor hosts a stack of at least three zones that host ironstones that in places have been mined for gold. Phase 2 drilling revealed the presence of easterly plunging mineralized shoots.
Date Added: 30-Jul-2018
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
MLC511_2009_A_01.pdf3.08 MBPDF Add
MLC511_2009_A_02_Plan1_Geology.pdf847.63 kBPDF Add
CR2009-0072_Appendices.zip2.35 MBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader