Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/87539
Export to Endnote
Title: Mount Shoobridge Project EL 24528 Annual report for the period 24 November 2008 to 23 November 2009
Title Holder / Company: Australian Tantalum
Haddington Resources
Report id: CR2009-0999
Tenure: EL24528
Year: 2009
Author: de Kever, N
Abstract: Exploration conducted on EL 24528 during the reporting period consisted of a geophysical (VTEM) survey and modelling of VTEM data. The VTEM survey identified one shallow anomaly which will be followed up with soil sampling, rock chip sampling and drilling.
Date Added: 30-Jul-2018
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL24528_2009_A.pdf17.42 MBPDF Add
CR2009-0999_VTEM_Survey.zip1.77 MBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader